Asbestos Inspection Report
Premise No.
101 MAIDEN LANE
Inspection Date:
As NOTED
Page 20fz
Inspector
Dennis Antzoulatos
SUNDAY
SEPTEMBER B 2002 (CONTINUED)
RONALD KING.
A LARGE MOLE IN THE ROOF SURFACE (PRE- EXISTING)
WAS PATCHED BY THE CONTRACTOR.
"FINAL" ALR SAMPUNG WAS
PERFORMED FOR THE RODF
cucer
AREA DUE TO EARLY STOPPAGE
OF THEE
" DURINC" ALR SAMPUNG.
MONDAY SEPIEMBER 9, 2002
THE
CLEAN UP OF THE
SET BACK RODE AREA IS CONDUCTED TODAY
AIR SAMPLNG FOR THIS PORTION OF THE CUEAN UP PROSECT IS PERFORMED
B4 FAYED ELGENDI CCERTIFICATE # AH O1 11631 EXP 03/03) OF WARPEN E
PANZER ENGINEERS.
AT THE CONCUSION DF THE CLEAN UP ACTIVITES
NO VISIBLE WTC DEBRIS WAS OBSERNED.