NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No.
81 NASSAU STREET
Inspection Date:
As
NOTED
Page 2 of 2
Inspector
Dennis Antzoulatos
FRIDAY SEPTEMBER 20 2002
(800 AM-800PM)
THE CUEAN UP OF THE MAiN ROOF WAS COMPLETED TODAY. THE
ROOF. AREA
TOO WET FOR A VISUAL INSPECTION: AIR SAMPUNG
FOR THE
DAY's
CUEAN UP ACTIVITES WAS PERFORMED BY DIPO ELEMO.
I CONOUCTED A VISUAL INSPECTION
FIRE ESCAPES.
DEBRIS WAS OBSERUED ON THE FIRE
ESCAPES AND IN THE MIDDLE PORTION OF THE SONTH FACADE A
RE CLEANING OF THESE AREAS WAS REQUESTED.
SATURDAY SEDTEMBER 21 2002 (800AM-700PM)
RE CUEANING OF THE SOUTH FACADE WAS COMPLETED. THE
CLEAN UP OF THE
SET BACI AREA BEGAN TODAY. AIR SAMPUNG FOR
PORTION OF THE CUEANUP WAS PERFORMED BSY DIPO ELEMO OF
WARREN & PANZER ENGINEERS.
AIR SAMPiES (5) WERE RUN ON THE
SEMI CIRCLE DOOF (3 SAMPUES) AND ON THE FIRE ESCAPE LANDING
ON THE 3R0 FLOOR (2 SAMPLES).
SUNDAY SEPTEMBER 22 2002
NO WORK WAS PERFORMED.
MONDAY SEPTEMBER 23 2002 (800AM-800PM)
THE CLEAN UP OF THE SET BACK AREA WAS COMPLETED. Air
SAMPUNG
FOR THE DAYS
ACTIVITIES LUAS PERFORMED BY DIPO ELEMO
A VISUAL INSPECTION OF THE
CIEANED WORK AREAS C SET BACK, SOUTH
FACADE & FIFE ESCAPES AND THE MAIN AND PENT MOUSE ROOF) WAS
CONDUCTED.
NO VISIBLE
WTa DEBRIS
WAS OBSEENED. THE CIEAN UP
PROSECT AT THE PREMISE IS NOW COMPLETE.
NYC-WTC_000099368