NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. 12 PLATT STREET
ARA 12 GOLD STREET
10 GolD STREET
Inspector
Dennis Antzoulatos
Inspection Date:
As
NoTED
Page z of_z
MONDAY OCTOBER 14, 2002 (0800AM-0700PM)- TUESDAY OCTOBER 15,2002
THE CUEAN UP OF THE EAST FACADE
SURFACES, FACING THE REAR,.
OF 215 AND 213 PEARL'STREET
WAS RONDUCTED TODAY.
AIR SAMPUNG
FOR THIS POPTION OF THE CUEANUP WAS PERPORMED BY IDRIS IDOWY OF
WARREN & PANZER ENGINEERS. AT THE CONCUSION OF THE CIEAN UP ACTIVITIES
A VISUAR INSPECTION OE THE CUEANED SURFACES WAS CONDUCTED BY IDRIS
NO VISIBLE LUTE DEBRIS WAS OBSERNED.
SATURDAY OGOBER 19,2002 (0600AM - 0600PM)
TRE CUEAN UP
OF THE NORTH FACADE OF THE PREMISE (PLATT STREET
SIDE MAS CONDUCTED.
A PLASTIC DÚKE WAS CONSIRUCTED TO SOLLEÇT
RUN OFF WATER. A DECONTAMINATION TRUCK WAS UTILIZED.
FACADE
SUPFACES WERK
ACCESSED
USINE TWO BOOM TRUCKS.
AIR SAMPUNG
WAS PEPFORMER BU LUIS SOTO (CERTIFICATE # AH 00-20894 EPP 03/03).
AIR SAMPUNS ECQUIPMENT WAS
SET UP ON THE OPPOSITE SIDE LALK.
AT TUE
CONCLUSION DF
CIEAN UP ACTUITIES A
VISUAR
INSPECTION WAS
PERFORMED
AND NO VISIBLE
LUTE DEBRIS
WAS OBSERED.
SUNDAY OCTOBER Z0 2002 (0GOCAM-0600PM)
THE CLEAN UP
OF THE WEST FACADE DF THE PREMISE (GOLP STREET)
WAS CONDUCTED. A PUASTIC DUKE WAS COLSTRUCTED TO COUECT RUN OFF WATER.
A DECONTAMINATION TROCK WAS UTILIZED.
FACADE SURFACES WERE
ACCESSED
BCOM TeucKs.
AIR SAMPUNG
WAS PERFORMED
BY LIS SOTO OF WARREN & PANZER ENGINEERS. AIR SAMPUNG EQUIPMENT
WAS SET UP
ON THE CPPESITE SIDELALKI
AT THE CONCNUSION OF
CUEAN UP ACTIVITIES
A VISUAL INSPECTION LAS PERRORMED AND NO VISIBLE
WTC DEBRE LAS OBSERUED. THE CUEAN UP PROSECT AT THE PREMISE IS
NoU COMFLETE.