NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 15 JOMN STREET Inspection Date: AS NOTED Page 2 of 2 Inspector Dennis Antzoulatos FRIDAY AUGUST 9 2002 (CONTINUED) AUGUSI I', 2002. THE CUEAN UP OF THE NORTH FACADE (2ND DROP ) WILL BEGIN ON MONDAY AUGUST R, 2002. SUNDAY AUGUST 11, 2002 (800AM-1030 PM) THE CUEAN UP OF THE SOUTH (JOHN STREET) FACADE IS CONDUCTED TODAY. THE CEAN UP OF THE SOUTH FACADE OF lI SOMN STREET OCCURS SIMULTANEDUSUY. FOR THE PURPOSES OF AIE MONITORING THE FACADES OF THESE TLOO BULDINGS ARE TREATED AS ONE WORU AREA. A PLASTIC DYKE IS. CONSTRUCTED TO COLECT PUN OFF WATER. A MOBILE DECON TRUCK IS UTILIZED. ALR SAMPUNG FOR THIS PORTION OF THE PROVECT IS PERFORMED By CHETRAM RAMRAS (CERTIFICATE # AM 28-198A2 ERP 07/03) OF WARREN E PANZER. FIVE AlR SAMPLES ARE POSi ON THE OPPOSITE SIDE WALK. A VISUAL INSPECTION OF THE CUEANED FACADE SURFACES IS NOT CONPUCTED TODAY DUE TO DARKMESS. MONDAY AUGUST 12 2002 (BODAM TO 800PM) I COMPUCT A VISUAL INSPECTION OF THE CIEANED FACADE SURFACES (3PM) AND OBSERUE NO VISIBLE WTC DEBRIS. NORTH FACADE CUEAN UP CONTINUESI AIR SAMPUNG IS PERFORMED BY ILUIS SOTO- OF WARREN & PANZER ENGINEERS. IUESDAY AUEUST 13 2002 (800 AM TO 800PM) TLE CUEAN UP OF THE NORTH FACADE IS COMPLETED. THE CLEAN UP OF THE ROOF IS BEGUN. MEDNESDAL AUGUST 1A 2002 TO THURSDAY AUGUST 15,2002 CEAN UP OF THE ROOF PROGRESSES AL PER THE APPROVED SCOPE ZF WORK. CLEAN UP DE THE ROOF HAS BEEN COMPLETED. A VISUAL INSPECTION OF THE ROOF AREA IS CONDUCTED ANO NO VISIBLE LTO DEBRIS IS OBSERNED. THE CLEAN UP OF THE SET BACH RODF AREA LAT THE BOTTOM OF THE NORTH FAOADE) BEGIAS TODAY. SATURDAY AUGUST IT 2007 (B00 AM TO 500PM) THE CIEAN UP OF THE AIR MONITORINGI FOR THIS PORTION EF THE PRONECI WAS PERFORMED BY ARTOUR MARTIROSSIAN (CERTIFICATE # AU 93-20192 EXP 01/03) OF WARREN AND PANZER. A VISUAL INSPECTION OF THE SET BACK ROOF WORK AREA IS CONDUCTED AND NO VISIBLE WTC DEBRIS WAS OBSERUED. THE CLAN UP PROSECT AT THIS PREMISE 1S NOW COMPLETE. NYC-WTC_000094285

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094285Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →