NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/75 MAIDEN LANE 1001112, 68/11
Document / 3 pages

Asbestos inspection log, 75 Maiden Lane facade cleanup, Aug 2002

Machine-extracted title · confidence 94%

Inspection log recording scaffold erection and cleaning of east and west facades at 75 Maiden Lane in mid-August 2002.

NYC-WTC_000102329–000102331

Folder label: “75 MAIDEN LANE 1001112, 68/11

Page image
Scanned page image, NYC-WTC_000102330
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 75 MAIDEN LANE Inspector Dennis Antzoulatos Inspection Date: A5 NOTED Page z of 3 GOLO STRRET. NO PLASTIE DYKE IS CONSTRUCTED (NO PUN OFF WATER). WEDNESDAY AUGUST 2I 2002 THE CUEAN UP OF THE GOUR STREET FACADE IS COMPLETED: A NISUAL INSPECTION OF THE CUEANER FACADE SUCFACES IS CONOUCTER, AT THE COMPLETION OF CLEANING ACTINITIES, AND NO VISIRLE CUTE DEISRIS IS OBSERNED. THURSDAY AUGUST 22, 2002 SCAFFOLDING CONTRACTOR ERECTS HANGING SCAFFOLD TA BE USER FOR THE CLEAN UP OF THE MAIDEN LANE (SOUTH ) FACADE. THE CLEAN-UP OF THIS FACADE IS SCHEDULED TO BEGIN ON SETURDAL AUGUST 24,2002. FRIDAY AUGUST 23, 2002 THE CIRAN UP OF THE ROOF OF THE PREMISE BEGINS TODAY. waekees BEGIN CIEANING THE MECHANICAL ROOM AND PENTHOLSE ROOF SUEFACES CHIGHER POOFS). AIe SAMPUNG FOR THIS PORTION OF THE CUEAN UP PROSECT IS PERCORMED BY LIS SOTO. SATURDAL AUEUST 2A 2002 THE CUEAN UP OF THE SOUTH (MAIDEN LANE) FACADE BEGAN TODAY. THE CLEAN UP OF THIS FACADE WILL BE DONE IN TUO PHASES. THE EASTERN HALF OF THE CLEANUP WAS PERFORMED TODAY. THE WESTERN HALE CF THE FACADE WIu BE CEANED ON SUNDAR ANGUST 25 2002. A PLASTIC DUKE WAS CONSTRUCTED TO COUECI BUN-OFE WATER. A MOBILE DECON TRUCK WAS UTUZED. ALR SAMPUNG FOR THIS PORTION Oi THE WORK WAS PERGORMED BI RONALO KING CCERTIFICArE* Asl 98- 2022C EXP 10/02) OF WARREN I PANZER. AT THE COMPLETION OF TODAY'S CUEANING ACTIVITTES. I CONDUCTED A VISUAL INSPECTION OF THE CUEAMED FACADE SUPFACES (EASTERN HALF OF THE FACADE) AND OBSERUED NO VISIBLE UUTC DEBRIS. SUNDAL AUGUST 25. 2002 THE CUEANUP OF THE WESTGRN HALF OF THE SOUTH CHAIDEN LANE) FACADE WAS PERFOFMED TODAY. A PLASTIC DURE LAS CONSTRUCTED TO COLERT RUNOFE WATER: A MOBLE DECON TRUCK WAS UTILZED. AIe SAMPUNG WAS PERrORMED BA RONALR KING OF WARDEN I PANZER. AT THE COMPLETION DF TODAY'S CLEANINE ACTUITIES, I CONDUCTED A VISUAL INSPECTION OF THE CUEANED FACADE JURrACES AND OBSERUED NO VISIBLE WTC DEBRIS. MONDAY AUGUST 26, 2002 THE CUEAN UP OF THE MECHANICAL ROOM ANP PENTHOUSE ROOE SURFACES PESUMES _AND IS COMPLETED TODAH. AIR SAMPUNG FOR THIS PORTION OF THE CUEANUP PROSECT Is PERFORMED BY LIS SOTO OF WARREN I PANZER ENGIARERS. FIVEE AIR SAMPLES ARE PUN 13 AlR SAMPRES ADE PON ON THE ROOF CLOWER (MAIN) RODF NYC-WTC_000102330

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102330Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →