NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No.
75 MAIDEN LANE
Inspector
Dennis Antzoulatos
Inspection Date:
A5
NOTED
Page z of 3
GOLO STRRET. NO PLASTIE DYKE IS CONSTRUCTED (NO PUN OFF WATER).
WEDNESDAY AUGUST 2I 2002
THE CUEAN UP OF THE GOUR STREET FACADE
IS COMPLETED: A
NISUAL
INSPECTION OF THE CUEANER
FACADE SUCFACES
IS CONOUCTER, AT
THE COMPLETION OF CLEANING ACTINITIES, AND NO VISIRLE CUTE DEISRIS
IS OBSERNED.
THURSDAY
AUGUST 22, 2002
SCAFFOLDING CONTRACTOR
ERECTS HANGING
SCAFFOLD TA BE
USER
FOR THE CLEAN UP OF THE
MAIDEN LANE (SOUTH ) FACADE.
THE CLEAN-UP
OF THIS FACADE IS SCHEDULED TO BEGIN ON SETURDAL AUGUST 24,2002.
FRIDAY
AUGUST 23, 2002
THE
CIRAN UP OF THE
ROOF OF THE PREMISE BEGINS TODAY.
waekees
BEGIN
CIEANING THE MECHANICAL ROOM AND PENTHOLSE ROOF
SUEFACES
CHIGHER POOFS).
AIe SAMPUNG FOR THIS PORTION OF THE
CUEAN UP PROSECT IS PERCORMED BY LIS SOTO.
SATURDAL AUEUST 2A 2002
THE CUEAN UP OF THE SOUTH (MAIDEN LANE) FACADE BEGAN TODAY. THE
CLEAN UP OF THIS FACADE WILL
BE DONE IN TUO PHASES.
THE EASTERN HALF
OF THE CLEANUP WAS PERFORMED TODAY. THE WESTERN HALE CF THE FACADE
WIu BE CEANED
ON SUNDAR
ANGUST 25 2002. A PLASTIC DUKE WAS CONSTRUCTED
TO COUECI BUN-OFE WATER. A MOBILE DECON TRUCK WAS UTUZED. ALR SAMPUNG
FOR THIS
PORTION Oi THE WORK WAS PERGORMED BI RONALO KING CCERTIFICArE*
Asl 98- 2022C EXP 10/02) OF WARREN I PANZER. AT THE COMPLETION OF TODAY'S
CUEANING ACTIVITTES.
I CONDUCTED A VISUAL INSPECTION OF THE CUEAMED FACADE
SUPFACES (EASTERN HALF OF THE FACADE) AND OBSERUED NO VISIBLE UUTC DEBRIS.
SUNDAL AUGUST 25. 2002
THE CUEANUP OF THE WESTGRN HALF OF THE SOUTH CHAIDEN LANE) FACADE
WAS PERFOFMED TODAY. A
PLASTIC DURE LAS CONSTRUCTED TO COLERT RUNOFE
WATER: A MOBLE DECON TRUCK WAS UTILZED. AIe SAMPUNG WAS PERrORMED
BA RONALR KING OF WARDEN I PANZER. AT THE COMPLETION DF TODAY'S CLEANINE
ACTUITIES, I CONDUCTED A VISUAL INSPECTION OF THE CUEANED FACADE JURrACES
AND OBSERUED NO VISIBLE WTC DEBRIS.
MONDAY
AUGUST 26, 2002
THE CUEAN UP OF THE MECHANICAL ROOM ANP PENTHOUSE ROOE SURFACES PESUMES
_AND
IS COMPLETED TODAH. AIR SAMPUNG FOR THIS
PORTION OF THE CUEANUP
PROSECT Is PERFORMED BY LIS SOTO OF WARREN I PANZER ENGIARERS. FIVEE
AIR SAMPLES ARE PUN 13 AlR SAMPRES ADE PON ON THE ROOF CLOWER (MAIN) RODF
NYC-WTC_000102330