Asbestos Inspection Report
Premise No.
116 BROADWAY
Inspection Date:
AS NOTED
Page 2 of 2
Inspector
Dennis Antzoulatos
MONDAY JULY 22 2002
THURSDAY JULY 25 2002
CUEAN UP OF THE
EAST FACADE 1S CONDUCTED. ALR SAMPUNG FOR
PORTION OF THE
WORK WAS
• PERRORMED BY EDWIN ELLIS ID (CERTIFICATE 4
AH 00-08613
ExP 10l02).
CONDUCTED A
VISUAL INSPECTION OF THE CUEANED
FACADE SURFACES ( WINDOWS AND LEDGES ONLL) AND FOUND NO VISIBLE WTE DEBRIS.
WEDNESPAY JULY 31 2002 TO THURSDAN AUGUST I 2002
CUEAN UP ACTIVITTES ON THE ALC UNIT SET BACK ARE CONDUCTED IN
ACCORDANCE WITH THE APPROVED WORK PROCEDURES. AIR SAMPUNG FOR THIS
PORTION OF THE WORK WAS CONDUCTED BY
FESTY OSEMWEGIE OF WARREN E PANZER.
THE CLEAN-UP OF THE
SOUTH FACADE (MAIDEN LANE FACADE) IS SCHEDULED FOR
SUNDAG
AUGUST 4 2002.
SUNDAY AUGUSI 4 2002
CUEAN UP ACTIVITIES ON THE SOUTH FACADE CMAIDEN LANE FACADE) ARE
CONDUCIED.
THE CUEAN UP IS LIMITED FRDA THE CIEANING OF THE FACADE
PROM THE 4TH FIDDR TO THE GROUND FIOOR.
A BOOM TRUCK IS USED TO ACCESS
THE FACADE SURFACESI A MOBILE DECON TRUCK IS EMPLOYED. A PLASTC DYKE
IS CONSTRUCTER TO
CATCH RUN OFF WATER.
AIR SAMPUNG FOR THIS PORTION
OF THE CUEAN UP IS PERFORMED BY DIPO ELEMO ( AH 01-14694 EXP 03/03) OF
WARREN I PANZER ENFINEERS. FIVE ALE SAMPLES ARE PON, I CONDUCTED A
VISUAL INSPECTION OF THE CLEANED FACADE SURFACES AND OBSERUED NO
VISIBLE CUTC DEBRIS. THE CUEAN UP PROJECT AT THIS PREMISE IS NoW
COMPLETE.