Asbestos Inspection Report
Premise No. ST PAUL'S CHAPEL
209 BROADWAY
Inspector
Dennis Antzoulatos
Inspection Date:
07-20-02
Page 2 of z
SATURDAY JULY 20 2002 (CONTINUED)
SOUTH FACADE
SURFACE ARERE MAVE BEEN CUEANED. À VISUML INSPECTION
IS PEQUESTED. BROAOWAY (FRONT) FACADE CLEANUP MSO COMPLETED.
4:00PM- 4:30 PM
I CONDUCT A VISUAL INSPECTION OF THE BROADINY (FRONT) FACADE
WITH SABA SiMIC OF TRIO ASBESTeS REMONAL CORP. VISIBE CiTE DEBRIS
STILL VISIBLE IN MANY AREAS OF THE FACADE. PECLEANING IS REQUIRED.
5:30PM
DEP ACP ENFORCEMENT DIRECTOR CARL LUTEHMEDIAL CONDUCIS THE VISUAL INSPECTION
OF THE BROADILNY
FACADE AFTER THE RE CIEANING. THE FACADE PASSES
THE SECONO VISUAL INSPECTION. I CONDUCT THE VISUAL INSPECTION OF THE
SOUTH FACADE. THE TOP LEDGE ON THE SOUT FACADE MAS NOT BEEN
CEANED. THE GENIE LIFT USEO IN THE CIEANUR COULO NET REACH THIS
LEDGE. THIS OBSTACLE 13 OUERCOME WHEN THE POLER WASHEE GLI, IS
ATTACHED TO A 2XA WOXD STLD AND RAISED BY THE LNDKER DUER 1IS
MEAO, TO THE LEDGE LEVEL. CUEAN UP OF THE NORTH (SIDE) FACADE PEGINS.
2:00PM
WORKERS
CEASE CUEAN CP ACTIVITES FOT THE DAL DISMANTUING OF THE
PLASTO DYRES AND REMONAL CF PLASTIC SHEETINGA ECEINS. THE REMAINDER
OF THE CLEAN UP WILL BIGIN TOMORROL.
8:COPM WURKERS LEAVE THE WORESITE FOR THE DAY.
NYC-WTC_000123642
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000123642Source: NYC Law Department, mirrored locally
Invoice from Fiber Control, Inc. dated July 18, 2002, billing the Department of Environmental Protection for facade cleaning services at multiple job sites.