SATURDAY JUL 20 2002 (CONTINUED)
4:00 PM
SOUT FACADE
IS REQUESTED.
SOFRUS AERS HAE BECAEOPDOAUNBUATO
A VISUAL INSPECTO
4:00PM- 4:30PM
I CONDUCT A VISUAL INSPECTION OF THE BROAOWAY (FRONT) FACADE
WIE SAGA SIMIC OF TRIO ASBESTOS REMOVAL CORP. VISIBE CTC DEBRIS
STIL VISIBLE IN MANY AREAS OF THE FACADE. PECLEANING IS REQUIRED.
5:30PM
DEP ACP ENFORCEMENT DIDECTOR CARL LUTCHMEDIAL CONDUCTS THE VISUAL INSPECTION
OF THE BROADLNTY
FACADE AFTER THE RECIEANING. THE FACADE PASSES
THE SECOND VISUAL INSPECTION. = CONDUCI THE VISUAL INSPECTION OF THE
SOUTH FACADE. THE TOP LEDGE ON THE SOUTH FACADE HAS NOT BEEN
CUEANED. THE GENIE UFT USED IN THE CUEANUP COULO NET REAOH TUIS
LEDGE. THIS OBSTACIE IS OVERCOME WHEN THE POLDER LUASHEE GUN, IS
ATTACHED TO A 2XA WOOD STUD AND PAISED BY THE WORKER QVER UIS
HEAD, TO THE LEDGE LEVEL. CUEAN UP DF THE NORTH (SIDE) FACADE REGINS.
7:00PM
WORKERS CEASE CLEAN UP ACTIVITES FOR THE DAY. DISMANTLING OF THE
PLASTE DYRES AND REMOVAL OF PLASTIC SHEETING BEGAINS. THE REMAINDETE
OF THE CLEAN UP WILL BEGIN TOMORROW.
8100PM WORKERS LEAVE THE WORRSITE FOR THE DAY.
NYC-WTC_000123645
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000123645Source: NYC Law Department, mirrored locally
Checklist form documenting building characteristics, facade visual inspection results, and asbestos presence assessment at 196 Broadway for post-9/11 environmental evaluation.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.982