NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 49/211 BROADWAY
Document / 6 pages

WTC building inspection form, 211 Broadway

Machine-extracted title · confidence 90%

Form documenting building inspection findings including facade assessment and ACM presence for a property in the WTC area.

NYC-WTC_000123643–000123648

Folder label: “211 BROADWAY

Page image
Scanned page image, NYC-WTC_000123644
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document .. Asbestos Inspection Report Premise No. ST. PAUL'S CHAPEL 209 BROADWAY Floor Zip Borough ROOF $ FACADES 1 Inspector Building Type Dennis Antzoulatos CHURCH Contractor's Name TRIO ASBESTOS PEMOVAL CORP Address 14-20 129TH SIRESET, COLEGE POINT State Phone NY 11356 (718) 261-4100 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 8T Inspection Date: 01-20-02 Squad # Badge # N/A A020 Basis of Inspection Photos Taken WTC Survey Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: BCAM TO 500PM SATURDAY JULY 20 2002 BOOM TRUCK ARRIVES: OUGE OFFICER YOUNG, JOMN BOYD (WARREN Y PANZER) AND T UP POLICE LINES FOR THE STREET (SIDELIMLK) MLOSURE OF BROADLSAE 8:45 AM TME MOBILE DECON UNIT (ON A TRUCK) ARRIVES. WORKERS BEGIN COUERING THE MEMORIALS PLACED ON THE GAATES CF ST. PAUÍS CHAPEL. CONSTRUCTION OF THE RASTIC DYKES FOR THE COLLECTION OF ANY RUN-OFF WATER BEGINS. 11:30 AM PLASTIC DYKE ON BROADWAY SIDEWALK HAS BEEN ERECTED. QOVERINGI OF MEMORIMS ON THE GATES OF THE CHUREH. JOHN BOYD SETS UP AIR SAMPLINE EQUIPMENT FOR THE FRONT (BROADWAY) FACADE CIEAN UP. SAMPLE LOCATIONS ARE AS Fonaus E l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ep. NYC-WTC_000123644

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123644Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →