NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 01/44 JOHN STREET 1001110, 67/30
Document / 10 pages

44 JOHN STREET 1001110, 67/30

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000092954–000092963
Page image
Scanned page image, NYC-WTC_000092959
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • • Asbestos Inspection Report Premise No. Floor ROOr $ FACADE Zip 10038 Inspector Dennis Antzoulatos AA JOHN STREET Borough 1 Building Type CHURCH Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn Block 30 . . Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A® Sample Number N/A Owner's Name Inspection Date: As. NOTED Squad# |Badge # N/A A020 Photos Taken Tes/NO 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Address City State Zip Phone Time of Inspection from: As NOTED THURSDAL SEPTEMBER 12 2002 THE CUEAN UP PROJECT AT THE CHURCH BEGINS IN THE EAST COURIYARD AND THE REAR CF THE CHURCH. A REMOTE DECONTAMINATION UNIT WAS ERECTED IN THE LEST COURTYARD. ALR MONITORING (SAMPUNGS FOR THIS PORTION тт те сноем вооть окса (ынном CUEAN UP WAS PERPORMED BY FESTY OSEMWEGIE CCETIFICATE # PII ERP 01/03). FRIDAL SEPTEMBER 13, 2002 THE CUEAN UP AT IHE EAST COURTYARD 15 COMPLETED (EAST FACADE CUEAMED, COURTHARO FLODR AND REMOVAL OF SOlL FROM GARDEN.). THE CLEAN UP IN THE WEST COURTHARD AND THE ROOF BEGINS.. AIR SAMPLNG FOR THIS PORTION OF THE CUEAN UP WAS PERFORMED BY FESTY OSEMWEGIE OF WARREN & PANZER ENGINEERS. SATURDAY SEPTEMBER 14 2002 THE CUEAN UP AT THE WEST COURTHARD (WEST FACADE CUEANED COURTHARO FLOOR CUEANED AND REMIOVAL OF SOIL FROM GARDEN) IS COMPLETED. THE CLEAN UP OF NORTH (JOHN STREET) FACADE WAS CONDUGTED TODAY. A PLASTIC DUKE WAS CONSTRUCTED TO COWECT WATER RUN OFFe AlR SAMPUNG FOR THIS PORTEN OF THE CHEAN UP WAS PERFORMED BY FESTE OSEMWEGIE. AT THE COMPLETION DE TODAL'S CUEAN UP ACTIVITIES, I CONDUCTED A VISUAL INSPECTION OF AU CUEANED L00RK ARERE. NO VISIBLE WTC DEBRIS WAS OBGERNED. THE CLEAN UP PROJECT AT THIS PREMISE IS NOW COMPLETE. NYC-WTC_000092959

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000092959Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →