NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/141 FULTON STREET
Document / 12 pages

Invoice for remediation work, 141 Fulton Street, Oct 2002

Machine-extracted title · confidence 95%

Invoice from a contractor for completed environmental remediation work at 141 Fulton Street totaling $25,960.

NYC-WTC_000127995–000128006

Folder label: “141 FULTON STREET

Page image
Scanned page image, NYC-WTC_000128006
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. Floor RUOF $ FACADE Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 Laboratory Name (718)531-2900 Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person 141 FULTON STREET Zip Borough Block 10038 89 Lot Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: As Squad # NOTED Badge# N/A A020 Photos Taken Tes/ No Address City State Zip Phone Time of Inspection from: AS NOTED SONDAY SEPTEMBER 29 2002 (0800AM -0600PM) THE CUEAN UP OF THE ROOF OF THE POEMISE BEGAN. A REMOTE DECENTAMINATION GNIT WAS ERECTED ON THE REOF OF THE PREMISE. AIR SAMPUNGI FOR THE DAY'S CUEAN UP ACTIVITIES WAS PERFORMED BY IDRIS IDOWY (CECTIFICATE # AH 02-11201 EXP 05/03). FOUR ALR SAMPLES WERE RUN ON THE CLEAN PORTION OF THE ROCF AND ONE AIR SAMPLE WAS RUN IN THE STAIRWELL LEADING TO THE ROOF. MONDAU SEPTEMBER 30 2002 (0800AM-0800PM) THE ROOF CUEAN UP IS COMPLETED, THE CUEAN UP OF THE NCRTH(REMR) FACADE AND BALCONIES BEGAN TODAY. AlR SAMPUNG FOR THE DAYS CLEAN UP ACTIVITTES WAS PERFORMED B$ YURI BEDIN (CERTIFICATE # AH 96-14947 EXP 02/03). TUESDAY DETOBER 1, 2002 (0800AM- O600PM) THE CLEAN UP OF THE NECTH FACADE AND THE BALCONIES WAS COMPLETED. Ale SAMPUNG WAS PERFORMED BY YURI BEDIN OF WARPEN & PANZER. AT THE COMPUETION OF TME CUEAN UP ACTIVITIES, I CONDUCTED A VISUAL INSPECTION OF THE CUEANED ROOF AND FACADE SUPFACES AND OBSERUED NO VISIBLE LUTC DEBRIS. SATURDAY OCTOBER 5 2002 (0600AM -1100AM) THE CIEAN UP OF THE SOUTH FACADE OF THE PREMISE WAS CONDUCTED TOPAY. THE CUEAN UP OF THE SOUTH FACADE OF THE ARIACENT PREMISE (143 FULTON ST) OCCURRET SIMULTANEDUSLY. FCR THE PURPOSES OF ALe SAMPUNG THE FACADES OF THESE TWO BUILDINGS WERE TREATED AS ONE WOIRK AREA. A BOOM TRUCK WAS UEED TO ACCESS THE FACADE SURFACES. AIR SAMPUNG FOR THIS PORTION OF THE CUEAN UP WAS PERFORMED BY EDWIN ELLS (CERTIFICATE # AH 00-00613 EXP 10/02). NO VISIBIE LOTC DEBRIS LAS OBSERUED AT THE CONCUSION DN THE CUEAN UP ACTIVITIES. THE CLEAN UP PROJECT IS NOLO COMPIETE NYC-WTC_000128006

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128006Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →