NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/141 FULTON STREET
Document / 12 pages

Invoice for remediation work, 141 Fulton Street, Oct 2002

Machine-extracted title · confidence 95%

Invoice from a contractor for completed environmental remediation work at 141 Fulton Street totaling $25,960.

NYC-WTC_000127995–000128006

Folder label: “141 FULTON STREET

Page image
Scanned page image, NYC-WTC_000127996
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION • Asbestos Control Program 59-17 Junction Boulevard, 8 Floor, Corona. NY 11388-5107 Building Dept or TRU No ONLY DA FOR OFFICIAL USE ONLY EN ~ru'va4~0c ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1. Yc.aovFde~ •.a }iTj ( fee Schedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.

I. FACILITY

2. Address I4L1V LTOJ 5•raEE-r Borough MN Zip

AKA 3. Block 89 4. Lot 2

5. Type of Facility MIXED '.SE 6. Name of Building 11. BUILDING OWNER

7. Name — fl 8. Contact Person _

9. Tel. # _ Fax #

10. Address City --__ --- State Zip __________-

III. GENERAL CONTRACTOR

11. Name ____ Tel. # _

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name BEN-SAcvt t W Kt1 R 2I3AU * S O3 co N•ra-oL. ___13. Contact Person

14. Federal Employer ID. # '_____ 15. Tel. # C-RS) 53 t - 29CO Fax # c-(9.) 2c 9- iSOS _____

16. Address i 24ta, t2At.P ►t 36NUc—___--_ City Orco►c~Y 14 __ State N Y __ Zip _ iL 2 36

V. THIRD PARTY AIR MONITOR

17. Name i►%A'f:.rs eO Pt:a zER G" 1 VEERS 18. Contact Person _

19. Federal Employer ID. # PII 20. Tel. # (212) hL2-oo'tz _Fax # _Czc2) g22- c~ 30

21. Address _21.8 E'As; A S Sxae et -- City New *& SaK — State _ Nom_ Zip _ J OC IT

22. Sample Analysis Laboratory ____ __ 23. NYS DOH ELAP # _

VI. PROJECT INFORMATION i 24_ Starting date for this portion of work _ 912 ? lt Projected completion date ~! 7

Asbestos work schedule ® Monday ® Tuesday ® Wednesday ® Thursday I9 Friday ® Saturday Sunday

Shift from: ®am ❑ pm to $ ❑ am ® pm

If other, specify Access to inspect the premises must be provided during the work schedule Indicated iri this item. d' 4w 25. Total amount of asbestos-containing material to be abated during this work ra ~oc9~~L~li

i298O Square Feet, and/or o Linear Feet 1ACP7 ~'tR;d;j ~r W0U1 E4vi

7Rpp

NYC-WTC 000127996

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127996Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →