Asbestos Inspection Report
Premise No.
1T6 BROADWAY
Inspector
Dennis Antzoulatos
Inspection Date:
AS NOTED
Page 2 of 2
MONDAY
JULY 22 2002
THURSDAL JULY 25 2002
EAST FACADE IS CONDUCTED. ALR SAMPLING FOR
THIS PORTION CF
WAS PERFORMET BY EDWIN ELLIS II (CERTIFICATE #
AM CC-CBGI3
CONDUCTED A VISUAL INSPECTIEN DF TRE CUEANED
FACADE
SURFACES (WINDOWS AND LEDGES ONLY). AND FOUND NO VISIBiE LUTC DEBRIS.
WEDNESDAY JULY 3i 2002
TO
THURSDAS AUGUST | 2002
CUEAN LP ACTIVITIES
ON THE
AIC UN.T SET BACK AZE CONDUSTED IN
ACCORDANCE WITH THE ADPROVED WORK
PROCEDURES.
AIR SANPLINGI FER THIS
PORTION OF THE WORK
WAS CONDUCTED BU FESTY OSEMWEGIE DF WARREN E PANZER.
THE CLEAN UP EF THE
SOUTH FACADE (MAIDEN LANE FACADE) IS SCHEDULED FUR
SUNDAY.
AUGUST 4 2002.
SUNDAY AUGUST 4
2002
CLEAN UP ACTIVITIES ON THE SOUTH FACADE CMAIDEN LANE FACADE) ARE
CONDUCTED.
THE CUEAN UP IS LIMITED
TO. THE CUEANING OF THE FACADE
FROM THE 4TL FLOOR TO THE GROUND FLOOR.
A BOOM TRUCK IS UEED TO AccESS
THE FACADE SURFACISI A MOBILE DECON TRUCK IS EMPLOYED. A PLASTE DYKE
IS CONSIRUCTED TO CATCH RUN OFF WATER.
AIR SAMPUNG FOR THIS PORTION
OF THE CUEAN UP IS PERFORMED BY DIPO ELEMO ( AH 01-14G94 ERP OS/03) OF
WARREN & PANZER ENFINEERS.
FIVE ALR SAMPLES ARE PON, I CONDUCTED A
VISUAL INSPECTION OF THE CLEANED FACADE SURFACES AND OBSERUED NO
VISIBLE WTC DEBRIS.
THE CUEAN LP PROJECT AT THIS PREMISE IS NoW
COMPLETE.
el
NYC-WTC_000122686
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000122686Source: NYC Law Department, mirrored locally
Invoice from Fiber Control, Inc. dated July 18, 2002, billing the Department of Environmental Protection for facade cleaning services at multiple job sites.