NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No.
Inspection Date:
9-11 MAIDEN LANE
AS NOTED
Inspector
Page 2 of z
Dennis Antzoulatos
THURSDAL SEPTEMBER 12 2002 (CONT)
PERFORMED E4 JURI BEDIN (CERTIEICATE I A 96-14947 eRF sElos) AND BONALD
KING (CERTIFICATE #t Al 98-20226 EXP 10102) 0F WARREN & PANZER ENGINEZRS
FRIDAY 'SEPTEMBER 13, 2002 - sATURDAY
SEPTEMBER 14 2002
NO WORK
WAS
ONGOING.
SUNDAN
SEPTEMBER 15 2002
THE CLEAN UP OF THE
SMAU ROOFS BEGAN TODAY. A ROMOTE
DECONTAMINATON UNIT: WAS ERECTED ON THE MAIN REOF. ALR SAMPUNE
FOR THIS PORTION OF THE CUEAN UP WAS PERFORMED BY EDWIN ELS
(CERTIFICATE # AH 00-00613
EXP 10l02). Ave SAMPLES WERE SET UP
ON THE MAIN (LOCER) ROOF, THE ENTRANCE TO THE ROOF AND THE DECON.
_MONDAY
SEPTEMBER 16. 2002
ROOF AREA.
TUESDAY SEPTEMBER 17 2002
THE CIEAN UP OF THE
MAIN ROOF
AND FIRE ESCAPE WAS
COMPLETED TODAY.
THE CUEAN UP OF THE 3RD FLOOR SET BACK unS
ALBO CONDUCTED,
TRESTLES
BETUEEN THE INTERIOR FACADES WERE
CUEANED TODAL. AIR SAMPUNG FOR THIS PORTION OF THE CUEAN UP
WAS PERFORMED B4 FURI BEDIN• AlR: SAMPLES WERE RUN ON THE
MAIN ROOF.
WEDNESDAL
SEPTEMBER 18. 2002
A VISUAL INSPECTION OF
THE CIEANED COORE AREAS WAS
CONDUCTED TODAL. NO VISIBLE WTE DEBRIS WAS CBEERNED. THE CUEAN UP
PROJECT AT THIS PREMISE IS NOLO COMPLETE.