NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No.
180 BROADWAY
Inspector
Dennis Antzoulatos
Inspection Date:
AS NOTED
Page 2 of 2
FRIDAY AUGUST 2 2002 - SUNDAY AUGUST 4 2002
CUEAN UP ACTVITIES ON THE SECOND FLOOR SET BACK ROOF AREA
ARE CONDUCTER. DUE TO SPACE LIMITATIONS STEP OFF PADS AND DOUBLE-
TUVEK SUITS ARE USED IN LIEU OF A REMOTE DECON UNIT. AIR SAMPUNG
I5 PERFORMED BY FESTY OSEMWEGIE CAM 01-01030 EXP 01/03) 0E WARDEN I
PANZER ENGINEERS, I CONDUCTED A VISUAL INSPECTION OF THE CUEANED
SURFACES AND OBSERVED NO VISIBLE WTC DEBRIS. THE CIEAN UP PROVECT.
AT THIS PREMISE IS NAW COMPLETE.