NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 35/90 MAIDEN LANE 1001016, 42/36
Document / 2 pages

Asbestos inspection log, 90 Maiden Lane facade, July 2002

Machine-extracted title · confidence 95%

Daily inspection log recording facade cleanup and air sampling activities at 90 Maiden Lane on July 1, 2002.

NYC-WTC_000102498–000102499

Folder label: “90 MAIDEN LANE 1001016, 42/36”

Page image
Scanned page image, NYC-WTC_000102499
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. 90 MAIDEN LANE Inspector Dennis Antzoulatos Inspection Date: 07-07-02 Page 3 of 2 SUNDAL JULY T, 2002 (CONTINUED) 3:30PM WORKERS C'ONSTRUCT PLASTIC DYKE FOR TME COLECTION OF ANK RUN-OFF WATER FROM THE FACADE CUEANUP BELCLS THE SIDEWALK BRIDGE. 5:30pM IPO ELEMO OF WARREN & PANZER CONDUCTS A VISUAL INSPECTION OF TA CLEANED FACADE SURFACES BELELi THE SIDELiALL BRIDGE AND OBSERNES NC VISIBLE WTC DEBRIS. 6:00PM WORKERS HAVE DISMANTLED THE DYKE REMOVED AL LABTE BAGS AND LEAVE THE WORKSITE. THE CLEAN UP PRIECT AT THIS PREMISE IS NOLI COMPLETE. NYC-WTC_000102499

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102499Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →