NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/90 MAIDEN LANE 1001016, 42/36
Document / 13 pages

Invoice for asbestos roof cleanup, 90 Maiden Lane, Jun 2002

Machine-extracted title · confidence 100%

Invoice from Asbestos Removal Corp detailing costs for cleaning debris from the roof of 90 Maiden Lane in June 2002.

NYC-WTC_000102470–000102482

Folder label: “90 MAIDEN LANE 1001016, 42/36

Page image
Scanned page image, NYC-WTC_000102480
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document "? 4s Asbestos Inspection Report Premise No. Inspection Date: 90 MAIDEN LANE Floor Zip Borough FACADE Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name TRIO ASBESTOS REMOVAL CORP Address City 14-20 129 TH:STREET, COWEGiE POINT Zip NY 11356 (718)961-4100 Laboratory Name - Warren & Panzer Engineers Inc. 228 East 45 Street City New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 42 Lot 36 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A® Sample Number N/A Owner's Name Squad # N/A 07-07-02 Badge # A020 Photos Taken Yes/ No Address City State Zip Phone Time of Inspection from: 8 AM - 6PM SUNDAY JULE 1, 2CCZ G:CCAM CLEAN UP ACTIVITIES BEGIN ON THE THeEE STORIES iCCATED ABCUE THE SiDE CUNLK BRIDGE. WORKERS GEGIN CONSTRUCTION DE A PLASTIC DIKE TO COLLECT ANY PUN-CFF WATER. A MOBILE DECON TRUCK Wini BE USED. 9:45 AM VACCUMING ACTIVIMES BEGIN. DIPO ELEMC (CERTIFICATE # AM 01-14694 EXP 03/03) CF CUARDEN & PANZER BEGIAS ALR SAMPUNG. FIVE AiR SAMPLES / 1G. DECON AND 4 ON THE STREET) ARE RUN 12:30 PM WORKERS HAVE NOT FINISHED THE FACADE CUEAN UP AS ORIGINALLE PLANNED. AT THLS TIME ONLY TRiC OF THE THREE VEVELS ABOUE THE SIDEWALK BRIDGE HAVE BEEN COMPLETED. THE FIVE ORiGINAL AIR SAMPLES ARE PLIED: FIVE ADDITIONAL SAMPLES WILL BE RUN FOR THE DEMAINDER OF THE CiEAN-UI. THE LOSOMEN OF THE SECOND SET OF AIR SAMPLES WIL BE IDENTICAL TO THE FIRST SET OF SAMPLES. 1:55AM BACF-UP GENERITOR WAS TAKEN DFE CUNTRACTCRS TRUCK AND PUT INTO SERVICE AFTER THE PRIMARA GENERATOR BEGAN MALFUNCTIONING | ASBESTOS HANOLER SUPERVISCE SASA SiMIC PERECRMED THIS FUNCTION ). 2:30PM DIPO ELEMO CONDUCTS A VISUAL INSPECTION OF THE CIEANED FACADE SURFACÉS LOCATED ABOVE THE SiDEWALK BRIDGE AND OBSERUES NO VISIBLE LTC DEBRIS. WCRXERS BEGIN REMONG ÜASTE BAGS GENERATED DY THIS PORTIONi eF THE CLEAN-UP. 3:00PM BAE-CLT ACTNITIES ARE COMPLETED, WORKERS BREAK FOR LLNCH. ees. NYC-WTC_000102480

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102480Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →