NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/90 MAIDEN LANE 1001016, 42/36
Document / 2 pages

Asbestos inspection log, 90 Maiden Lane facade, July 2002

Machine-extracted title · confidence 95%

Daily inspection log recording facade cleanup and air sampling activities at 90 Maiden Lane on July 7, 2002.

NYC-WTC_000102496–000102497

Folder label: “90 MAIDEN LANE 1001016, 42/36

Page image
Scanned page image, NYC-WTC_000102496
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. 90 MAIDEN LANE Floor Zip Borough FACADE 1 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name TRIO ASBESTOS REMOVAL CORP Address 51-20 129 TM STEET CoLEae PoINT Phone 11356 (718)961-4100 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 42 Inspection Date: 07-07-02 Squad # Badge # N/A A020 Basis of Inspection Photos Taken WTC Survey Tes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: 8°AM - 6°PM SUNDAY JULY 7, 2002 8:00AM CLEAN UP ACTIVITIES BEGIN ON THE THREE STORIES LOCATED ABOUE THE SiDE wAcK BRIDGE. WORKERS BEGIN CONSTRUCTION DF A PLASTIC DYKE TO COLECT ANY RUN-OFF WATER. A MOBILE DECON TRUCK WIi BE USED. 9:45 AM VACUUMING ACTIVITIES BEGIN. DIPO ELEMO (CERTIFICATE # AM. 01-14694 EXP 03/03) OF WARDEN & PANZER BEGINS ALR SAMPUNG. FIVE ALE SAMPUES ( 1G DECON AND 4 ON THE STREET) ARE RUN. 12:30 PM WORKERS HAVE NOT FINISHED THE FACADE CUEAN UP AS ORIGINALLY PLANNED. AT THIS TiME ONU TWC OF THE THREE UEVELS ABOUE THE SIDEWALK BRIDGE HAVE BEEN COMPLETED. THE FIVE ORIGINAL AIR SAMPUES ARE PLLLED : FIVE ADDITIONAL SAMPUES WILL BE RUN FOR THE REMAINDER OF THE CIEANUP. THE LOCATION OF THE SECOND SET OF ALR SAMPLES WIL BE IDENTICAL TO THE FIDST SET OF SAMPLES. 1:55AM BACKUP GENERARDR WAS TAKEN OFF CANTRACTOR'S TRUCK AND PUT INTO S ERNICE AFTER THE PRIMARA GENERATOR BEGAN MALPUNCTIONING |ASBESTOS MANDLER SUPERVISOR SASA SIMIC PERFORHED THIS FUNCTION). 2:30PM DIPO ELEMO CONDUCTS A VISUAL INSPECTION OF THE CLEAMED FACADE SURFACES LOCATED ABOVE THE SIDEWALK BRIDGE AND OBSERUES NO VISIBLE WTC DEBEIS. WORKERS BEGIN REMOENG WASTE BAGS GEMERATED RY THIS PORTION OF THE CLEAN-UP. 3:00PM BALOUT ACTNITIES ADE COMPLETED. WORKERS BREAK FOR LUNGH. NYC-WTC_000102496

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102496Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →