NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/86 1/2 Nassau St
Document / 2 pages

Asbestos inspection log, 86 1/2 Nassau Street, Jul 2002

Machine-extracted title · confidence 95%

Daily inspection log documenting facade cleaning and air sampling activities at 86 1/2 Nassau Street on July 14-15, 2002.

NYC-WTC_000098978–000098979

Folder label: “86 1/2 Nassau St

Page image
Scanned page image, NYC-WTC_000098979
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. Floor OF AL ACAD Inspector Dennis Antzoulatos Contractor's Name Benjamin Kurzban & Son Control City 1248 Ralph Avenue, Brooklyn State Zip NY 11236 Phone (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person 86%½ NASSAU STREET Zip Borough Block 10038 1 78 Building Type COMMERCIAL Inspection Date: AS NOTED Lot Squad # Badge # N/A A020 Basis of Inspection Photos Taken WTC Survey Ves/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name HON. EDWARD FINCH Address City State NY Zip 10021 Time of Inspection from: Phone PiЇ AS NOTED 1:00AM 9:00AM 10:30AM 12:00 PM 12:45 PM 4:00PM 4:00-5:00PM 5:10 PM 6:00pM WORKERS BEEIN THE CONSIRUCTION OF A DYKE TO COUECT WATER FROM FACADE CLEANUPS. THE FACADE CUEAN UP OF 86, 86Y2, AND 88 NASSAU STREET WILL OCCUR SIMULTANEGUSLY AND WILL BE TREATED AS CNE WORK AREA FOR THE PURPOSES OF ALR MONITORING. DYKE HAS BEEN CONSTRUCTED. A MOBILE DECON TRUCK WILL BE USED. WORKERS BEGIN VACUUMING BUUK MATERIAL FROM THE FACADE. FESTY OSEMWEGIE OF WARREN AND PANZER BEGINS AlR SAMPLING. FIVE AIR SAMPLES WILL BE RUN. VACUUMING COMPLETED. WORKERS BREAK FOR LUNCH. WASHING OF FACADES BEGINS WASHING OF FACADES COMPLETED I CONDUCT A VISUAL INSPECTION OF THE CUEANED FACADES AND OBOERNE NO VISIBLE WTC DEBRIS WORKERS DISMANTLE DYKE WORKERS LEAVE THE WORKSITE. MONDAY JULY 15, 2002 8:00 AM WORKERS BEGIN CUEAN UP ACTINITIES ON THE BOOF. AR SAMPUNG WIL DE CONDUCTED B4 FESTY OSEMWEGIE OF WARREN & PANZER ENGINEERS, AIR. SAMPUNG PUMPS LOCATED ON THE RRCE OF THE ADJACENT BUILDING (122 FAESON STREET) 2:00PM WORKERS CUMPLETE THE POOF CLEAN UP AND BREAK FOR LUNCH. A VISUAL INSPECTION WIU BE CANDUCTED WHEN THE WOKK ARKA IS DRN. 4:00PM I CONDUCT A VISUAL INSPECTION OF THE WOSK AREA AND OBSERNE NO VISIBLE WTC DEBRIS. THE CLEAN UP PROSECT AT THIS PREMISE 1S NOLS COMPLETE. NYC-WTC_000098979

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098979Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →