Revised Change Order #024R submission, Nov 1998 · page 1NYC-WTC_000171914
Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order for OEM equipment, Nov 1998 · page 1NYC-WTC_000171916
Change order #024 from November 1998 for installing control systems and cabling for the Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #025 for roof antenna support, Nov 1998 · page 1NYC-WTC_000171920
Quotation for structural steel supports and fireproofing required to mount microwave dishes on the World Trade Center roof in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #028 for electrical work, 7 World Trade Center, · page 1NYC-WTC_000171930
Contractor submission of change order #028 for conduit modification and wire installation at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #029 for duplex outlets, 7 World Trade Center, · page 1NYC-WTC_000171932
Contractor submission of change order #029 to install two duplex outlets and a switch in the training room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #030 for concrete pad and drilling, Nov 1998 · page 1NYC-WTC_000171934
Ambassador Construction change order #030 detailing costs for a concrete pad, drilling, and oil leak detection basin.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #031 for security wire installation, Nov 1998 · page 1NYC-WTC_000171939
Ambassador Construction change order #031 for installing security wire in conduits at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #033 for conduit and grounding work, Nov 1998 · page 1NYC-WTC_000171955
Ambassador Construction change order #033 detailing costs for conduit extension, sleeves, outlets, and grounding.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for OEM, Nov 1998 · page 1NYC-WTC_000171966
DCAS memo approving multiple change orders for work at the Mayor's Office of Emergency Management in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #012 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171968
Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #013 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171972
Change order submission by Ambassador Construction for framing work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #019 for OEM, 7 World Trade Center, Oct · page 1NYC-WTC_000171973
Submission of change order #019 by Ambassador Construction Co. to replace acoustic panels at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #020 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171975
Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #021, 7 World Trade Center, October 1998 · page 1NYC-WTC_000171977
Construction change order for water tank and switch gear work on the 7th floor of 7 World Trade Center, totaling $20,342.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo approving change orders for OEM, Nov 1998 · page 1NYC-WTC_000171978
DCAS memo approving multiple change orders for work at the Mayor's Office of Emergency Management in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #011 from Ambassador Construction, Oct 1998 · page 1NYC-WTC_000171980
Change order submission by Ambassador Construction for door modifications at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Credit change order #014 for OEM, 7 World Trade Center, · page 1NYC-WTC_000171981
Submission of credit change order #014 by Ambassador Construction Co. to remove costs for emergency generator field testing.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #015 for OEM, 7 World Trade Center, Oct · page 1NYC-WTC_000171983
Submission of change order #015 by Ambassador Construction Co. to install sleeves and perform firestopping at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1NYC-WTC_000171987
Authorization form issued to proceed with revised scope of services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment Request #2 for lease, 7 WTC, Sept 1998 · page 1NYC-WTC_000171989
Certified mail requesting payment of $3,500,000 under the lease agreement for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project 96-1346 construction cost estimates memorandum, July 1998 · page 1NYC-WTC_000171990
DCAS memorandum regarding construction cost estimates for Mayor's Office of Emergency Management project at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter revising approved alteration costs, 7 World Trade Center, Aug · page 1NYC-WTC_000171993
DCAS correspondence revises the approved cost for specific alteration items at the Mayor's Office of Emergency Management floors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 approval for sheetrock wall offset, 7 World · page 1NYC-WTC_000171995
DCAS letter approves a revised cost of $7,000 for Change Order #1 to install a sheetrock wall offset on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of Change Orders #3 and #4, 7 World Trade · page 1NYC-WTC_000171996
DCAS correspondence approves costs for Change Orders #3 and #4 regarding electrical changes and bulletin board installation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Approval of change orders #6, 8, 9 & 10, 7 · page 1NYC-WTC_000172000
DCAS correspondence confirms approval of multiple change orders for door revisions and associated costs at the project site.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #6 for work at 7 WTC, Sept · page 1NYC-WTC_000172002
Memo submitting revised Change Order #6 for $406 for unspecified scope of work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #006 for bullet resistant door, 7 World Trade · page 1NYC-WTC_000172003
Ambassador Construction submits change order to furnish a Level 3 bullet-resistant door at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #9 for wood door work, 7 WTC, · page 1NYC-WTC_000172006
Memo submitting revised Change Order #9 for $11,707 to modify wood doors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #009 for wood door upgrades, 7 World Trade · page 1NYC-WTC_000172007
Ambassador Construction submits change order to upgrade painted doors to mahogany and modify specific door numbers.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #10 for package receiver, 7 WTC, Sept · page 1NYC-WTC_000172008
Memo submitting revised Change Order #10 for $2,666 to furnish and install a special class I package receiver at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1NYC-WTC_000172010
Authorization form issued to proceed with revised scope of services and expense reporting for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet for OEM project conversation, Jan 1998 · page 1NYC-WTC_000172017
Cover sheet for a fax transmission dated January 30, 1998 regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #3 submission, 7 WTC, Aug 1998 · page 1NYC-WTC_000172026
Cover sheet and scope of work for Change Order #3 submitted by Ambassador Construction Co. Inc. to [name] Properties at 7 World Trade Center on August 26, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #004 systems installation, 7 WTC, Aug 1998 · page 1NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Bulletin #1 cost proposal for hurricane wall work, Sept 1998 · page 1NYC-WTC_000172039
Cost comparison sheet detailing labor and material estimates for hurricane wall modifications at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, 7 WTC, Sep 1998 · page 1NYC-WTC_000172050
Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #4 submission, Sept 1 1998 · page 1NYC-WTC_000172098
Letter submitting revised change order #4 for concrete work and panel installation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #4 submission, Sept 1 1998 · page 2NYC-WTC_000172103
Letter submitting revised change order #4 for $180,087 covering concrete work and graphic annunciator panel installation at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Payment Request for lease, 7 WTC, July 1998 · page 1NYC-WTC_000172107
Certified mail requesting payment of $7,000,000 under the lease agreement for 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo approving revised change order #1, Aug 11 1998 · page 1NYC-WTC_000172109
Letter approving a revised change order for sheetrock wall offset work.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change Order #1 for sheetrock wall offsets, 7 WTC, July · page 1NYC-WTC_000172110
Memo submitting Change Order #1 for $10,817 to furnish and install sheetrock wall offsets at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Change order #1 submission, 7 World Trade Center, July 1998 · page 1NYC-WTC_000172111
Contractor submits change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS letter regarding cost approval and reconsideration, July 8, 1998 · page 1NYC-WTC_000172113
DCAS letter referencing a $12.8 million cost approval and requesting reconsideration of item #8.
Citywide Administrative Services, Dept. of · Box 7DCAS
Budget estimate for hurricane wall construction, June 11, 1998 · page 1NYC-WTC_000172115
Contractor submits a budget estimate of $473,870 for constructing the hurricane wall at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Proposals for hurricane wall and visual work, 7 WTC, June · page 1NYC-WTC_000172117
Memo enclosing proposals from a contractor for hurricane wall construction and visual work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS response to clarifications, 7 WTC, June 2, 1998 · page 1NYC-WTC_000172121
DCAS letter responding to contractor's clarifications regarding the Mayor's Office of Emergency Management project at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised proposal submission, 7 World Trade Center, June 10, 1998 · page 1NYC-WTC_000172123
Contractor submits a revised proposal totaling $11.6 million for demolition and construction work at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised proposal submission, 7 World Trade Center, June 1998 · page 1NYC-WTC_000172126
Contractor submits a revised proposal totaling $11.6 million for demolition and construction work at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Hand-delivered letter from architects, June 30, 1998 · page 1NYC-WTC_000172130
Hand-delivered letter from architects proposing additional design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design proposal, 7 World Trade Center, June 1998 · page 1NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS