NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premises: Inspection Date:
130 Liberty Street 02/09/09
Floor Zip Borough Block Lot Squad# Badge #A011
Various 10006 1 54 1 1
Inspector Building Type Basis of Inspection Photos Taken
N. Patel A TRU2068MN08 Yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Oiwner’s Name
TRC Environmental corp. The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr. /TRC Environmental 8:50 am - 9:50 am (3^^ 4'^ 2'’'* & l” floor) and
1:25 pm-2:10 pm (5*" floor).
On the 3'“ floor, I entered to the work area with PPE and met Mr. Geraldo and Mr. Jeiry Kadzilla, supervisors.
There were 31 people working on the floor. They were demolishing walls and shaft area, boxing debris, cutting
pipes with HEPA vacuum attached to the power tool, clearing off floor, preparing Gaylord boxes spraying
amended water on the debris in the boxes. Four (4) Gaylord boxes and numerous poly wrapped beams piled on
the floor ready to be load out. Negative Air pressure was -0.07.1 used stair B to go to 4*'’ floor.
On the 4”’ floor, 1 met Mr. Victor, foreman. There were 10 people working on the floor. They were clear off
floor for demo and cleaning water from floor by vacuum. One micro trap machine was'not running and without
Air filter. 1 took photo and told foreman to fix the problem. An inspection was done on micro trap machines and
micro trap tents - Air pumps were on. 1 used stair B to go to 2"“’ floor.
On the 2"^* and V floor, 1 met Mr. Jose Jimenez, supervisor. There were 22 people working on the both floors
under Mr. Jimenez. They were demolishing walls and bathroom, cleaning out shaft, spraying amended water on
the debris, boxing debris and preparing Gaylord boxes. Three (3) Gaylord boxes and numerous poly wrapped
beams piled on the floor ready to be load out. I found no water near stair B to clean rubber shoes. I told
supervisor to put water near stair and he did that. I used stair B to go back to 3'^'’ floor, proceeds to the
decontamination system and showers out.
On the 5*’’ floor, 1 enters to the decontamination system with ATC personal and Mr. Amel Java! of TRC, suits
up, dons respirator, enters to the containment and met Mr. Rocco paves, supervisor. There were 26 people
working on the floor. They were cleaning work area by vacuuming, checking critical barriers and re-sealing with
duct tapes, boxing bags and changing Air filters. Eight (8) Gaylord boxes and number of plastic bags were on
the floor ready to be load out. Negative Air pressure was -0.020. Two Micro trap machines were not running and
without Air filters. 1 took photos and told foreman Mr. Raul to fix it. .Also, I found few holes in the plastic
banier. 1 show to Mr. Arnel Javal of TRC and also Mr. Paul, foreman and told Foreman to fix it and he did that.
1 proceeded to the decontamination system, decontaminated myself, signed the log book and exited out. My
observations were discussed with TRC personal.
NOV# RtSULT
2
“ROW
NOV# bUrtHVIbOK
Borough l=Manhattan 2=Bronx 3-Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 .stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4= Project not started (no NOV) 5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131197
NYC-WTC_000182032
OCR can misread numbers and units. Confirm readings against the page image before using them.