Premise No. Inspection Date:
130 Liberty Street 03/05/09
Floor IZip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
WI.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:45 pm to 2:40 pm
I arrived at the premise at 1:45 pm. LVI schedule informed that activities include: scrape fireproofing, clear off
floor, temp platforms in shaft on S'^floor, demo walls, clear off floor, scrape fireproofing, erect platforms various
locations on 2"'' floor, clear floor, cut ducts, demo walls, ceilings on 1®’ floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on 2'^floor. One worker was present for the decon maintenance.
I used B stairwell to proceed to the 3'"^ floor.
S'’" Floor - 41 workers were present. Workers were found in the process of: scraping fireproofing at the area 3,
cleaning the floor, placing debris into the boxes; workers on scissor lifts at the various locations were cutting
metal fixtures from the ceiling; sealing the B stairwell wall. Eagle scaffolding workers were erecting platforms
across the south side shaft; others were cutting metal and placing into the boxes, spraying with amended
water, wrapping beams with poly, preparing and loading out boxes. 30 Gaylord boxes were ready to be taken
out. Inspection was done on micro trap machines and tents, I observed that one light bulb had no protection.
Foreman was advised to contact the electricians to set up the cage immediately,
I used B stairwell to proceed to the 2"'’ floor.
2"'* Floor - 58 workers were found inside the work area. Workers on scaffolds were washing the ceiling and
beams at the area 2 and 3, cleaning the floor, picking up excess water and gross saturated debris, covering
micro trap machines and tents. Workers on mezzanine were fine cleaning beams and columns, plasticizing the
rest of the area with poly. At the south/west side of the work area workers on scissor lifts were demolishing the
brick wall, spraying with amended water. Eagle scaffolding workers erecting the scaffolds at the north/east side
vestibule. Other workers were plasticizing the platform, cutting metal using tools attached to the HEPA vacuum,
wrapping beams with poly, preparing boxes. 60 Gaylord boxes were on the floor sealed, sprayed and ready for
load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the 1’* floor.
V Floor - 78 workers were on the floor. Workers on scissor lifts were demolishing the brick wall and spraying
with amended water; removing insulation and cutting heating pipes at the'various locations of the floor; workers
on scissor lifts were removing hard concrete drop ceiling clearing shafts, placing debris into the boxes and
spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and
loading out boxes through the east side waste decon, A large amount of debris and poly wrapped beams exists
on the floor. 25 Gaylord boxes were on the floor ready to be taken out. Inspection was done on micro trap
machines and tents,
I used B stairwell to go back to the 2"'^loor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Mantiattan 2=Bronx j=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = violation Issued 2-No Violation Issued 3-No access 4=Project not started (no NOV)
5=Public Owned Property