Asbestos inspection log, 130 Liberty Street, March 6, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 6, 2009, by TRC Environmental Corp.

NYC-WTC_000182013
Page image
Scanned page image, NYC-WTC_000182013
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No Inspection Date; 130 Liberty Street 03/06/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze_____ F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:00 am to 8:45 am

I arrived at the premise at 8:00 am. LVI schedule informed that activities include: remove walker ducts and raceways on 6"' floor, scrape fireproofing, clear off floor, temp platforms in shaft on 3'‘‘floor, clear off floor, scrape fireproofing, erect platforms various locations on 2"'’ floor, clear floor, cut ducts, demo walls, ceilings on T'floor

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3'^floor. One worker was present for the decon maintenance.

3’'“ Floor - 42 workers were present inside the work area. 3 workers were plasticizing the deck at the north/east side area, wrapping with poly and elevating cables, sealing the shaft area, critical barriers, west side platform, plasticizing the floor, moving platforms to the area 5, preparing for fireproofing removal. Eagle scaffolding workers were erecting platforms across the east side shaft. Other workers were cutting metal and placing into the boxes, spraying with amended water, wrapping beams with poly, preparing boxes. 5 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I observed the hole on the north/east side of the critical barrier, and one micro trap machine was not running. Handler Supervisor was advised and he directed workers to: seal the opening and repair micro trap machine.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor.

Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor^^nitial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued ,3=No access 4=Project not started (no NOV) 5-Publie Owned Property

CITY D EP_WO RBY_CAN NATA_SU B P_000131158

NYC-WTC_000182013

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182013Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →