Asbestos inspection log, 130 Liberty Street, June 6, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on June 6, 2009, by TRC Environmental Corp.

NYC-WTC_000181973
Page image
Scanned page image, NYC-WTC_000181973
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 06/06/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M Gagnidze F TRU2068IV1N08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY tooia NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proi. Mqr/TRC Environmental 7:00 pm to 7:40 pm

I arrived at the premise at 7:00 pm. LVI schedule informed that activities include; clear floor, scrape fireproofing, demo, load out on 1®' floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on V*floor. Two workers were present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.034.

1** Floor - 30 workers were present on the floor. Workers were found on north/west side mezzanine near west side personal decon scraping the ceilings, vertical and horizontal beams, spraying with amended water to wash and clean, picking up fireproofing debris, using metal shovels, placing into the boxes. Two asbestos handlers on mezzanine at the right side of the personal decon and one worker on scissor lift were demolishing the wall, breaking cinder blocks, spraying with amended water. Other workers were re-plasticizing the critical barriers at the west and east shaft areas, cutting metal into the pieces, spraying with water, preparing and loading out boxes through the waste decon. 12 Gaylord boxes were on the floor ready for load out. 40 micro trap machine were on and 5 on stand by. Inspection was done on micro trap tents.

Using entrance from the first floor I proceeded to the basement.

Bsmt - No activities or personnel observed on site. 10 micro trap machines were powered on. I went back to the V floor.

After following the decontamination procedure I exited the work area. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor's Initial 4^'

Borough l=Manhattan 2=Bronx 3=Brooldyn 4=Queens 5=Richmoiid Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131089

NYC-WTC_000181973

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181973Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →