NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 30, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 30, 2009, by TRC Environmental Corp.

NYC-WTC_000182025
Page image
Scanned page image, NYC-WTC_000182025
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/30/09 Floor Zip Borough Block Lot Squad # Badge # Various TiTtTiT 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 Tes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. MgrZTRC Environmental 10.30 pm to 11:25 pm .

I entered the premise at 10:30 pm. LVI schedule informed that activities include: demo walls, ceilings, ducts on 1®' floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on l”floor. Four workers were present for the decon maintenance, cleaning shower chambers and organizing the clean room. Negative air pressure was -0,038.

1®' Floor - 75 workers were observed inside the work area, working on mezzanines at the various locations: clearing off the floor from debris, spraying with amended water, placing debris into the boxes; cutting and removing hard drop ceiling; cutting conduit; HEPA vacuum has been attached during cutting.

Workers at three locations harnessed in scissor lifts were breaking down the hard drop ceiling, cutting metal fixtures, spraying with amended water. Four workers were plasticizing frames around the machines inside of mechanical room.

Other workers were: cutting metal into small pieces at the various locations, placing into the boxes and spraying; wrapping beams with poly, loading out sealed and sprayed boxes through the north side waste decon. A large amount of debris and poly wrapped beams still exists on the floor.

40 Gaylord boxes were to be taken out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.

After following the decontamination procedure I signed the log book and left the decon.

Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmoncl Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Piiblic Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B P_000131186

NYC-WTC_000182025

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182025Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →