NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, April 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on April 27, 2009 by TRC Environmental Corp.

NYC-WTC_000181998
Page image
Scanned page image, NYC-WTC_000181998
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 04/27/09 Floor nZip Borough Block Lot Squad # Badge # Various[ 10006 1 ~ 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadw^ New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proi. Mgr/TRC Environmental 8:50 am to 9:45 am

I entered the premise at 8:50 am. LVI schedule informed that activities include: Clear floor, cut ducts, demo walls, ceilings on 1®’ floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on Y'floor. Two workers were present for the decon maintenance, cleaning shower chambers and organizing the clean room. Negative air pressure was -0.025.

1®' Floor - 75 workers were present inside the work area.

Workers on mezzanine of the north/east side work area were demolishing the drop Ceilings and spraying with amended water. Workers harnessed in scissor lifts were demolishing the brick wall. Two workers on the north side of the work area were cutting and removing air duct, using power tool with HEPA vacuum attached. On mezzanines at the various locations workers were demolishing the brick wall and spraying with amended water, breaking down hard drop ceiling, placing debris into the boxes.

Other workers were: cutting metal into small pieces at the various locations using power tools with HEPA vacuum attached, placing into the boxes and spraying; wrapping beams with poly, loading out sealed and sprayed boxes through the north side waste decon.

40 Gaylord boxes were ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.

After following the decontamination procedure I signed the log book and left the decon. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131143

NYC-WTC_000181998

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181998Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →