Asbestos inspection report, 130 Liberty Street, June 2009

Machine-extracted title · confidence 95%

Inspection record for asbestos at 130 Liberty Street conducted on June 8, 2009 by TRC Environmental Corp.

NYC-WTC_000181948
Page image
Scanned page image, NYC-WTC_000181948
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 06/08/09 Floor Zip Borough Block Lot Squad # Badge # Various Tniiiii 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY S (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 11:10 pm to 12:00 pm

I arrived at the premise at 11:10 pm. LVI schedule informed that activities include: clear floor, scrape fireproofing, demo, load out on V* floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on V'floor. Two workers were present for the decon maintenance, cleaning shower chamber and organizing the clean room. Negative air pressure on the floor was -0.031.

1®' Floor - 53 Workers were inside the work area, cutting metal panels from the column using equipment equipped with HEPA vacuum; demolishing the wall of shaft located at the north/west side, spraying with amended water; still scraping the fireproofing at the area #5: cleaning the floor of mezzanine, picking up debris, placing into the boxes; workers on scaffolds at the extended area were scraping the ceilings, vertical and horizontal beams, column. Others were cleaning the floor from debris, washing scaffolds and equipment, spraying the area with amended water, preparing and loading out boxes through the waste decon. 5 Gaylord boxes were on the floor ready for load out. 40 micro trap machines were on and 5 on stand by. Inspection was done on micro trap tents.

At the east side of the area I observed that main layer of exhaust duct at the east side area were cut off. I took photos, then Handler Supervisor Victor was advised, he immediately directed workers exhaust ducts were repaired in concern.

After following the decontamination procedure I exited the work area. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l-Maiiliattan 2-Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131039

NYC-WTC_000181948

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181948Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →