Asbestos inspection record, 130 Liberty Street, Apr 2009

Machine-extracted title · confidence 95%

Inspection log documenting asbestos survey activities at 130 Liberty Street on April 1, 2009.

NYC-WTC_000181930
Page image
Scanned page image, NYC-WTC_000181930
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 04/01/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 10:30 pm to 11:30 pm

I entered the premise at 10:30 pm. LVI schedule informed that activities include: demo walls, ceilings, ducts on T” floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on Vfloor Four workers were present for the decon maintenance, cleaning shower chambers and organizing the clean room. Negative air pressure was -0.028.

1’* Floor - 78 workers were present inside the work area. Two damaged exhaust ducts, that I observed during my earlier inspection, were repaired. Demolition of the equipments and installations inside the former computer room was not completed, workers were cutting and removing conduit using equipment equipped with HEPA filters.

Workers on mezzanines at the various locations were cutting and removing air ducts, spraying with amended water, placing debris into the boxes.

Workers harnessed in scissor lifts were cutting metal fixtures from the ceiling, spraying with amended water.

Other workers were: cutting metal into small pieces at the various locations, placing into the boxes and spraying; wrapping beams with poly, loading out sealed and sprayed boxes through the north side waste decon. A large amount of debris and poly wrapped beams still exists on the floor.

Still 55 Gaylord boxes were on the floor ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.

After following the decontamination procedure I signed the log book and left the decon.

Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Projcct not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130779

NYC-WTC_000181930

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181930Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →