NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 11, 2009 by TRC Environmental Corp.

NYC-WTC_000182003
Page image
Scanned page image, NYC-WTC_000182003
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/11/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp TJnel^weHVIanhattanpeyelopmert^^ Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 10:10 pm to 11:10 pm

I arrived at the premise at 10:10 pm. LVI schedule informed that activities include: clear floor, cut ducts, demo walls, ceilings on V floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 1’“floor. Three workers were present for the decon maintenance, cleaning the shower chambers and organizing the clean room. Manometer reading of the negative air pressure was -0.034.

1” Floor - 56 workers were present. Two workers were demolishing the brick wall of the shaft using hammer, two others were clearing the shaft from debris, spraying with amended water, placing into the boxes.

Three workers on mezzanine inside the engine room were cutting and removing conduit. At the east side vestibule workers on scissor lift were breaking down the hard drop ceiling, using hammer, bringing down pieces from ceiling to the floor; one worker was spraying the area with amended water.

Other workers were: elevating electrical cables, working at the electrical panel, cutting metal into small pieces at the various locations, placing into the boxes and spraying with amended water, preparing boxes, loading out sealed and sprayed boxes through the north side waste decon. A large amount of debris and poly wrapped beams still exists on the floor.

35 Gaylord boxes were on the floor ready to be taken out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.

After following the decontamination procedure I signed the log book and left the decon.

Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough 1 “Manhattan 2=Bronx 3=Brooklyn , 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Properly

CITY DEP WORBY CANI'JATA SUBP 0001.31148

NYC-WTC_000182003

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182003Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →