NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, June 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on June 1, 2009 by TRC Environmental Corp.

NYC-WTC_000181993
Page image
Scanned page image, NYC-WTC_000181993
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date; 130 Liberty Street 06/01/09 Floor Zip Borough Block Lot Squad # Badge # Various TililW 1 54 1 1 A062 Inspector Building Type Basis of inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proi. Mqr/TRC Environmental 1:45 pm to 3:00 pm

I arrived at the premise at 1:45 pm. LVI schedule informed that activities include; fine clean floor on 3^'^ and 2"“^ floors, clear floor, scrape fireproofing East & SW sides, loading out boxes to ATC trailer on 1 floor, demo pipes & ducts, box out debris in the Basement. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3'‘'loor. One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.030. S'"* Floor - 14 Asbestos Handlers were inside the work area. Workers on scissor lifts were spraying and washing beams and ceilings at the east side, vacuuming the floor using wet-dry shop HEPA vacuum, plasticizing the floor at the north side area, preparing and loading out sprayed and sealed boxes. 7 Gaylord boxes were on the floor ready for load out. 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used “C” stairwell to proceed to the 2"'* floor. 2"“ Floor - 14 workers were found inside the work area in the process of demolishing scaffolds at the Atrium area, washing the walls, plastics, partitions, cleaning the floor with equipment equipped with HEPA vacuum; cutting metal fixtures from the vertical beam, removing plastics from the south/east side wall, caring carts loaded with pieces of washed scaffolds. Other workers were preparing and loading out boxes. 5 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used stairs to proceed to the 1 floor work area. r* Floor - 58 workers were present inside the work area. Workers were found in the process of: scraping fireproofing at the area 2 and 3, scraping ceilings, vertical and horizontal beams. Eagle scaffolding workers were erecting scaffolds at the east side column. Carpenters were erecting the wall at the west side work area. Other workers were: spraying the areas with amended water, cleaning the floor from ceiling cleaning, picking up debris, placing into the boxes, preparing and loading out boxes through the waste decon. 22 Gaylord boxes were on the floor ready for load out. 40 micro trap machine were on and 5 on stand by. Inspection was done on micro trap tents. Using entrance from first floor I proceeded to the basement. Bsmt - 2 workers were plasticizing the decon, preparing the area for air duct removal. 3 Gaylord boxes were on the floor ready to be taken out. Using exit to the 1” floor, then stairs I proceeded back to the 3"* floor. After decontamination procedure I used north side hoist to proceed to the 7*’ floor. 7*' Floor - 14 workers were working on Exterior Facade removal, wearing the suits, PPE and gloves, removing metal panels and glass from the windows, placing debris into the boxes, spraying the area with amended water. 8 sealed and sprayed Gaylord boxes were ready to be taken out. I used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor's Initial

Borough l=Manhartan 2=Bronx 3^Brooklyn 4=Queeiis 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN N ATA_SU B P_000131123

NYC-WTC_000181993

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181993Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →