Asbestos inspection log, 130 Liberty Street, May 20, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on May 20, 2009, by LVI Environmental Services Inc.

NYC-WTC_000181984
Page image
Scanned page image, NYC-WTC_000181984
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 05/20/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:45 am to 10:25 am

I arrived at the premise at 8:45 am. LVI schedule informed that activities include: Stair B cleaning from 6'*' to 5“' floors, scraping Atrium area on 2'"' floor, clear floor, cut ducts, pipes, scrape fireproofing South East side, TRC/ATC visual, Eagle scaffolding - erect platforms in various shafts, loading out boxes to ATC trailer on Y* floor. I proceeded to the decon on 6*” floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area B stairwell. One worker was present for the decon maintenance. Negative air pressure of the area was -0.033. I used the stairs to proceed to the e*” and 5"^ floors.

6“’ & 5'” Floors - 14 Workers were found at the B stairwell in the process of sealing pipes with plastic, taping the edges and critical barriers with duct tape using ladders; fine cleaning and wet wiping the walls and stairs using mops, fabrics, brushes, rags, sponges, using water and Betco solution to remove the mold. Using stairs I went back to the 6*’’ floor decon. After decontamination procedure I left the decon and used south hoist to proceed to the 3'^ floor.

I proceeded to the decon on 3"* floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. One worker was present for the decon maintenance. I used the C stairwell to proceed to the 2"'' floor.

2'"' Floor - 16 Asbestos Handlers on scaffolds were still scraping the fireproofing at the area 10 - Atrium Area, washing scaffolds and equipment, spraying the fireproofing with amended water. Workers on the floor were removing marble and cleaning the bottom of the east side beam from the debris - mixed fireproofing and plaster; sweeping the floor using equipment equipped with HEPA filters, placing debris into the boxes. Others were replacing the filters of micro trap machines, preparing and loading out boxes. 8 sealed Gaylord boxes were on the floor, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used the stairs to proceed to the 1 floor.

1’* Floor - 64 workers were on the floor. Workers on mezzanine were scraping the area 4, spraying with amended water, sweeping the floor, picking up debris using metal shovels; scraping the ceilings, beams and columns from fireproofing at the area 1 - south side, cleaning the floor from debris, placing into the boxes; Eagle scaffolding workers were erecting platforms inside the west and east 2 shafts. Workers on scaffolds inside the west#2 shaft were cutting and demolishing metal panel from the wall - to open the area for fireproofing removal. Others were: removing metal fixtures from the wall and cutting metal into the pieces and spraying with amended water inside the former computer room; wrapping beams with poly, preparing and loading out boxes through the waste decon. 45 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131102

NYC-WTC_000181984

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181984Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →