Asbestos inspection record, 130 Liberty Street, Sep 2008

Machine-extracted title · confidence 95%

Inspection log documenting asbestos survey activities at 130 Liberty Street on September 13, 2008.

NYC-WTC_000181914
Page image
Scanned page image, NYC-WTC_000181914
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 09/13/08 Floor Zip Borough Block I Lot Squad # Badge # Various 10006 1 54 I 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gaqnidze A TRU0086MN08 no Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:45 am to 11:35 am I arrived at the premise at 9:45 am. LVI informed that scheduled activities include: fine cleaning on 15'" and 14'" floors, scraping, boxing Debris on 13'" floor, finish scraping, cutting raceways on 12'" floor, demo boxing debris on 11'" floor and demo, boxing debris. Eagle putting platform across shaft, direct installing fall protection cables on 10'" floor. I entered the decon area, suit up, don respirator and entered containment on 15'" floor. One worker was present cleaning in decontamination enclosure system. 15'" Floor - 25 workers were on site. Workers were observed in shaft area, fine cleaning beams and columns, preparing for visual inspection, vacuuming up the floor, re-sealing the top of electrical room. Inspection was done on micro trap machines and micro trap tents. 20 Micro trap machines were powered on and 5 were on stand by. I used B ladder to proceed to 14'" Floor. 14'" Floor - 31 workers were present on the floor, workers were on 6 scaffolds on the west side of work area and 3 ladders inside the shaft area, cleaning beams and ceiling, others cleaning the floor, preparing boxes, 2 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. 20 micro trap machines were powered on and 5 were on stand by. I used ladder to go back to the 15'" Floor, proceeded to the decon, showered out and signed the log book. Using the north hoist I proceeded to 13'" floor, went to the decontamination enclosure system and after signing the log book donned personal protection and accessed the work area. 13*" floor - 24 workers were observed on the floor. Workers on 5 scaffolds in the shaft area and 2 ladders on west side of vestibule were cleaning and scraping the beams and columns, spraying with amended water and vacuuming up the water from the ceiling cleaning, wrapping debris, preparing Gaylord boxes, spraying debris with amended water. 20 micro trap machines were powered on. Inspection was done on micro trap tents. I used b stairs to enter 12'" floor. 12'" floor - 25 workers were present: on 6 scaffolds on west side of the work area workers were cutting the raceways, spraying the area with amended water, preparing boxes, demolishing the wall to clean the beams and columns from fireproofing by the north/west side shaft. I observed two leaks on the west and south/east side of area. 20 micro trap machines were powered on. I used B stairs to proceed to 11'" floor. 11'" floor - 24 workers were on the floor. Work activities included: demolishing of the air duct, drop ceiling. Wrapping beams with poly, cutting metal into small pieces, spraying with amended water, cleaning the floor from debris. 15 Gaylord boxes were ready to be taken out. 20 micro trap machines were on. 10'" floor - 14 people were present. Workers were loading out boxes, cutting metal into the pieces and spraying with amended water, wrapping debris, carpenters setting up the floors around the shaft areas, others removing the pipe insulation on the east side area. 7 Gaylord boxes were ready for load out. 20 micro trap machines were powered on. I used b stairs to go back to 15'" floor, proceeded to the decon, showered out and signed log book. I used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130571

NYC-WTC_000181914

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181914Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →