NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 3, 2009 by TRC Environmental Corp.

NYC-WTC_000182009
Page image
Scanned page image, NYC-WTC_000182009
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/03/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY liHBl6 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:50 pm to 3:10 pm

I arrived at the premise at 1:50 pm. LVI schedule informed that activities include: demo in shafts, demo walls, clear off floor. Eagle installing platforms in shaft on S'" floor, demo walls, clear off floor, scrape Mezzanine fireproofing. Eagle erect platforms various locations on 2"'’ floor, clear floor, cut ducts, demo walls, ceilings on 1 floor. Negative air manometer reading was 0.031.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 2"‘’floor. Two workers were present for the decon maintenance. I used B stainfl/ell to proceed to the 3"“ floor.

3''^ Floor - 32 workers were observed on the floor in the process of: demolishing sheetrock wall between A and B stairwells, spraying amended water, collecting debris; two workers were erecting the scaffolds, preparing for fireproofing removal. Workers on scissor lifts were cutting metal fixtures from the ceiling at the various locations of the work area, carpenters building the platforms in the shaft area. A large amount of debris and poly wrapped beams exists on the floor. Workers were cutting metal with the tools attached to the HEPA vacuum, preparing and loading out boxes. 50 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I observed that door of A stairwell needed to be re-taped. Supervisor was advised and the door was re-sealed immediately. I used B stairwell to proceed to the 2"“ floor.

2"““ Floor - 56 workers were found inside the work area, cutting metal fixtures from the ceiling at the various locations. Workers were clearing off the floor, washing equipment, wrapping electrical cables, plasticizing the critical barriers. Others were cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 5 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the V floor.

1*‘ Floor - 81 workers were present on the floor. Workers were clearing the shaft, placing debris into the : boxes; demolishing brick wall and spraying with amended water; workers on scissor lifts were demolishing hard concrete drop ceiling, removing black metal panels from the columns at the east side of the work area, cutting metal at the various locations into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 65 Gaylord boxes were on the floor ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 2'''’floor.

After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor's Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=^0 access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D i i' WO RBY_CAN NATA_SU B P_000131154

NYC-WTC_000182009

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182009Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →