NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/02/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:40 pm to 2:45 pm
I arrived at the premise at 1:40 pm. LVI schedule informed that activities include: demo in shafts, demo walls,
clear off floor. Eagle temp platforms in shaft on S"* floor, demo walls and ducts, clear off floor, scrape
Mezzanine fireproofing, Eagle erect platforms various locations on 2' floor, clear floor, cut ducts, demo walls.
ceilings on V floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on S'^floor. One worker was present for the decon maintenance.
3'“ Floor -33 workers were observed inside the work area. Workers were: erecting platforms across shafts,
using scissor lifts to cutt heating pipes at the east and south/east side area, cutting metal into the pieces,
placing into the boxes and spraying, workers inside the second electrical room, located at the south/north side,
were cutting dead pipes and plasticizing the room inside, picking up debris, wrapping beams with poly. Workers
on scissor lifts at the various locations of the work area were cutting metal fixtures from the ceiling. Carpenters
working with plywood, preparing to erect the platforms around the shaft. A large amount of debris and poly
wrapped beams were on the floor. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 2"'' floor.
2"'* Floor -33 workers were present on the floor. Workers on scissor lifts were breaking brick walls on the east
and south/east side of the work area. A large amount of brick debris covered with poly observed on the floor.
Workers on mezzanine between 2"" and V floors were scraping fireproofing, cleaning the floor, spraying work
area with amended water. At the north/east side vestibule workers were demolishing the column fagade -
removing metal panels and lifting them down. Removing metal panels from columns of the critical barrier to
scrape the fireproofing. Electricians cutting dead pipes inside the electrical room, other workers were wrapping
beams with poly and moving on the cart close to the waste decon. I observed that one light bulb with open cage
was hanging down. Supervisor was advised, and he contacted electrician to repair the coverage. 35 micro trap
machines were powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the 1" floor.
1®' Floor - 42 workers observed on the floor. Workers on scissor lifts were demolishing brick wall and spraying
with amended water on the east side of the work area; removing hard concrete drop ceiling, removing black
metal panels from the columns at the south side of the floor, clearing shafts, placing debris into the boxes and
spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and
loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the
floor. 5 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and
tents.
I used B stairwell to go back to the 3"’floor.
After following the decontamination procedure I signed the log book and used north hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough 1 “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building I'ype A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2^No Violation Issued 3""No access 4=Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131164
NYC-WTC_000182019