Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 2, 2009 by TRC Environmental Corp.

NYC-WTC_000182011
Page image
Scanned page image, NYC-WTC_000182011
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/02/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken MGagnidze_____ F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York state Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from; Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:40 pm to 2:45 pm

I arrived at the premise at 1:40 pm. LVI schedule informed that activities include: demo in shafts, demo walls, clear off floor. Eagle temp platforms in shaft on 3"“ floor, demo walls and ducts, clear off floor, scrape Mezzanine fireproofing. Eagle erect platforms various locations on 2"“ floor, clear floor, cut ducts, demo walls, ceilings on 1®' floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3'^floor. One worker was present for the decon maintenance.

3’ '' Floor -33 workers were observed inside the work area. Workers were: erecting platforms across shafts, using scissor lifts to cutt heating pipes at the east and south/east side area, cutting metal into the pieces, placing into the boxes and spraying, workers inside the second electrical room, located at the south/north side, were cutting dead pipes and plasticizing the room inside, picking up debris, wrapping beams with poly. Workers on scissor lifts at the various locations of the work area were cutting metal fixtures from the ceiling. Carpenters working with plywood, preparing to erect the platforms around the shaft. A large amount of debris and poly wrapped beams were on the floor. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2™ floor.

2"“' Floor -33 workers were present on the floor. Workers on scissor lifts were breaking brick walls on the east and south/east side of the work area. A large amount of brick debris covered with poly observed on the floor. Workers on mezzanine between 2"'* and 1®’ floors were scraping fireproofing, cleaning the floor, spraying work area with amended water. At the norfh/easf side vestibule workers were demolishing the column fagade - removing metal panels and lifting them down. Removing metal panels from columns of the critical barrier to scrape the fireproofing. Electricians cutting dead pipes inside the electrical room, other workers were wrapping beams with poly and moving on the cart close to the waste decon. I observed that one light bulb with open cage was hanging down. Supervisor was advised, and he contacted electrician to repair the coverage. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 1®' floor.

r* Floor - 42 workers observed on the floor. Workers on scissor lifts were demolishing brick wall and spraying with amended water on the east side of the work area; removing hard concrete drop ceiling, removing black metal panels from the columns at the south side of the floor, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 5 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the S^'ifloor.

After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l^Manhallari 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131156

NYC-WTC_000182011

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182011Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →