Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 05/20/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 no
Contractor’s Name Sample Number
LVl Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
state Zip Phone State Zip Phone
NY 10018 NY 6 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:55 pm to 2:45 pm
I arrived at the premise at 1:55 pm. LVl schedule informed that activities include: scraping Atrium area on 2'"’
floor, clear floor, cut ducts, pipes, scrape fireproofing South East side, TRC/ATC visual. Eagle scaffolding -
erect platforms in various shafts, loading out boxes to ATC trailer on 1’* floor.
I proceeded to the decon on S'^floor, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area. One worker was present for the decon maintenance.
Negative air pressure of the area was -0.031. I used the C stairwell to proceed to the 2"“ floor.
2"'* Floor - 16 Asbestos Handlers were present inside the work area. Workers on scaffolds were scraping the
fireproofing at the area 10 - Atrium Area, washing scaffolds and equipment, spraying the fireproofing with
amended water; workers on the floor cleaning the floor using equipment equipped with HEPA filters, placing
debris into the boxes.
At the north/west side of the work area workers were inside the west #2 shaft cutting ducts and conduits, lifting
pieces down, spraying the area with amended water.
Others were preparing and loading out boxes. 10 sealed Gaylord boxes were on the floor, sprayed and ready
for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap
tents.
I used the stairs to proceed to the V* floor.
1” Floor - 64 workers were on the floor. Workers at the south/west side vestibule were cutting and removing
the metal panels from the 1”, 2"'’ and 3"“ vertical beams to open the areas for fireproofing removal. On the
south side mezzanine workers were breaking the blocks, spraying with amended water, placing debris into the
boxes. Workers on mezzanine at the south side were scraping the area 4, spraying with amended water,
cleaning the floor, picking up debris using metal shovels; scraping the ceilings, beams and columns from
fireproofing at the area 1 - south side, cleaning the floor from debris, placing into the boxes.
Workers inside the west#2 shaft were clearing off the floor from debris and spraying with water. Others were
cutting metal into the pieces and spraying with amended water inside the former computer room; cutting
conduits and placing on carts; wrapping beams with poly, preparing and loading out boxes through the north
side waste decon.
15 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2___________________
NOV# Infraction Infraction Infraction Supervisor's Initial
Borough 1-Manhattan 2-Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131101