NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date;
130 Liberty Street 05/22/09
Floor iZip Borough Block Lot Squad # Badge #
Various_______ 10006 _J_____ 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze_____ F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone state Zip Phone
NY lonifi NY 10006 (212)962-2300
Contact Person Time of Inspection from;
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 12;55 pm to 1:55 pm
I arrived at the premise at 12:55 pm. LVI schedule informed that activities include: scraping Atrium area on 2"“
floor, clear floor, cut ducts, pipes, scrape fireproofing South East side, TRC/ATC visual. Eagle scaffolding -
erect platforms in various shafts, loading out boxes to ATC trailer on 1®* floor.
I proceeded to the decon on 3"'' floor, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area. One worker was present for the decon maintenance.
Negative air pressure was -0.028.
I used the C stairwell to proceed to the 2"“ floor.
2'"' Floor - 18 Asbestos Handlers were found on the floor in the process of: scraping, washing and cleaning the
ceilings, walls, beams, and columns of the area 10 - Atrium Area, preparing the area for TRC visual inspection.
At the north/west side area inside the west shaft workers were cutting air duct using equipment equipped with
HEPA vacuum, spraying around the area with amended water.
Workers on the floor were sweeping the floor using equipment equipped with HEPA filters, placing debris into
the boxes; Inspecting and covering electrical panel with plastic.
Others were replacing filters of micro trap machines, preparing and loading out boxes. 30 sealed Gaylord boxes
were on the floor, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents.
1 used the stairs to proceed to the V floor.
1®* Floor - 66 workers were on the floor. Eagle scaffolding workers were erecting the scaffolds inside the east
and west2 shafts. Asbestos Handlers were washing, cleaning and plasticizing the ceilings and floors on
mezzanine and lower level of the area 1, sweeping the floor using wet-dry shop HEPA vacuum, picking up
debris, placing into the boxes.
At the former computer room workers on ladder were cutting and removing metal panels attached to the
columns.
Others were: wrapping beams with poly, cutting metal into the pieces, preparing and loading out boxes through
the north side waste decon. 50 Gaylord boxes were ready for load out. Inspection was done on micro trap
machines and tents.
I observed that two micro trap machines at the north side of the work area were without power. I took the
photos and advised Handler Supervisor that negative pressure ventilation equipment shall be inspected
periodically. He connected the power cord of the micro traps immediately.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories D <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Pub]ic Owned Property
CITY DEP_WORBY_CANNATA SUBP_000131097
NYC-WTC_000181981