NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/31/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 5:55 pm to 6:45 pm
I entered the premise at 5:55 pm. LVI schedule informed that activities include:
demo walls, ceilings, ducts on V floor.
1 proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on Vfloor. Four workers were present
for the decon maintenance, cleaning shower chambers and organizing the clean room.
Negative air pressure was -0.024.
1®' Floor - 83 workers were present. Workers were working on mezzanines at the various
locations using ladders: demolishing the brick wall and spraying with amended water,
cutting air ducts, breaking down hard drop ceiling, cutting metal and clearing off the
floor of mezzanine from debris, spraying with amended water, placing debris into the boxes.
Workers harnessed in scissor lifts were demolishing the drop ceiling, cutting metal
fixtures from the ceiling and wall, removing tiles from the wall, spraying with amended water.
Three workers were observed inside mechanical room, cleaning and vacuuming
the area, plasticizing frames around the machines .
Other workers were: cutting metal into small pieces at the various locations,
placing into the boxes and spraying; wrapping beams with poly, loading out
sealed and sprayed boxes through the north side waste decon.
A large amount of debris and poly wrapped beams still exists on the floor.
Approximately 65 Gaylord boxes were ready for load out. 35 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
After following the decontamination procedure I signed the log book and left the decon.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richniond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131065