NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection record, 130 Liberty Street, Mar 2009

Machine-extracted title · confidence 95%

Inspection log documenting asbestos survey activities at 130 Liberty Street on March 23, 2009.

NYC-WTC_000181931
Page image
Scanned page image, NYC-WTC_000181931
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/23/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from; Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:50 am to 11:00 am

I arrived at the premise at 9:50 am. LVI schedule informed that activities include: scrape fireproofing, clear off floor on 3^‘'floor, clear off floor, scrape fireproofing, erect platforms various locations on 2™* floor, clear floor, cut ducts, demo walls, ceilings on V* floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3"1oor Two workers were present for the decon maintenance, cleaning the shower chambers and organizing the clean room. Negative air pressure on the floor was -0.046.

3''* Floor - I observed 36 workers on the floor in the process of scraping fireproofing and washing beams and columns at the area 12, cleaning the platforms of the scaffolds, picking up debris from the floor, placing into the boxes. Other workers were in the scissor lift re-sealing the north side critical barriers with poly, preparing and loading out boxes. 18 Gaylord boxes were ready to be taken out, 23 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I observed dirty filters of micro trap machines. Supervisor was advised and he directed worker to replace the filters. I used B stairwell to proceed to the 2"“ floor.

2"" Floor - 54 workers were found inside the work area. Workers were on scaffolds removing fireproofing at the areas 11 and 12, washing and cleaning the beams and columns, sweeping floor. Entries around the areas were sealed with poly At the North side vestibule Eagle scaffolding workers were erecting platform. Other workers were sweeping the floor using equipment equipped with HEPA filters, preparing and loading out boxes 8 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I observed the exhaust duct of the micro trap machine has been detached. Handler Supervisor was advised, who directed workers to re-taped air duct immediately. I used B stairwell to proceed to the 1^' floor.

Floor - 67 workers were present on the floor. Workers on scissor lifts at the various locations were removing insulation and cutting airducts; cutting and demolishing metal partition; clearing shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces, wrapping beams, preparing and loading out boxes through the waste decon. Eagle scaffolding workers were erecting platforms. A large amount of debris and poly wrapped beams exists on the floor. 20 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents.

I observed: 1. Two workers at the different locations of the floor were cutting metals with power tools with HEPA vacuum attached, but not powered on. 2, Light bulb was hanging without protection cage on it. I met Handler Supervisor and advised him to keep close watch to the HEPA equipment that has to be powered on during cutting, and call electricians to place protection cage on the bulb. I used B stairwell to proceed to the 3'" floor. After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailers.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned

CITY_DEP_WORBY_CANNATA_SUBP_000130780

NYC-WTC_000181931

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181931Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →