Scope of work bid for structural steel, May 1998 · Box 7DCASNYC-WTC_000172303
Bid document from KS Inc. detailing structural steel framing and metal decking work for the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964
Feinstein KS Inc. structural steel quote, May 1998 · Box 7DCASNYC-WTC_000172733
Formal quotation from Feinstein KS Inc. to the Mayor's Office of Emergency Management for structural steel and metal decking at the World Trade Center.
1 shared non-person entities · Same agency, volume and box · similarity 0.947
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.894
RFI log for 7 World Trade Center, revised July 22, · Box 7DCASNYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
1 shared topics · Same agency, volume and box · similarity 0.892
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCASNYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.891
Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.891
Change order #004 systems installation, 7 WTC, Aug 1998 · Box 7DCASNYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
1 shared topics · Same agency, volume and box · similarity 0.891
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.890
P&S Industries quote for kitchen appliances, May 1998 · Box 7DCASNYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.888
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.887
Letter regarding Change Order #004, August 1998 · Box 7DCASNYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.887
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared non-person entities · Same agency, volume and box · similarity 0.887