← Document results/7DCAS/Mayor's Office of Emergency Management®Scope of Work Included in Bid
Document / 1 page

Scope of work bid for structural steel, May 1998

Machine-extracted title · confidence 95%

Bid document from KS Inc. detailing structural steel framing and metal decking work for the Mayor's Office of Emergency Management.

NYC-WTC_000172303

Folder label: “Mayor's Office of Emergency Management®Scope of Work Included in Bid

Page image
Scanned page image, NYC-WTC_000172303
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ypElNSTEI KS, INC.; iaONWOS

126-85 WILLETS POINT BOULEVARD FLUSHING, NEW YORK 11368 May 19,1998 Telephone; 718-899-8300 Fox: 718-335-3243 Ambassador Construction Corp. Inc.

Att; Mi. Jack Klein;

Ke: MAYORS OFFICE OF EMERGENCY MANAGEMENT

SCOPE OF WORK iNCUTnED TN RTT>

1) F & I structural steel framing.— 2) F & I metal floor deckiag.(as specified)— 3) F & I steel frame with posts & McNichols grati ig @ fueld oil pump room A- (page Al-1 & Sect 9) 4) F & I one (1) new bUco door & rung type ladde r~ Page Al-1 — 5) F & X new wire mesh Wall @ 7-0* high with tw6 (2) swinging gates with locks; -I (PA23-1) 6) F & I 2x2 @6** long angle clips @ top of masonry partition wall. Approximately 75 linear feet( or 75 clips) @ partition type 10 only ( P Al-1) ocf^ 7) F & I steel tubes @ A/V enclosures Page D-3. (two (2) sections only. Tubes to be bolted to floor and ceiling. Tubes @ 2 x 2 to be strapped together. Tubes @4x4 to be erected loose. Layout of location by others. — 8) F & 11/4 plate walls, Ceilings & Floor, @ room 12 x 10 x 9-0” high @ page IKlp. Plates to be seam welded together(no grinding of welds). Channel framing at " walls & ceilings to be bolted together, Access with freight elevator assomed to ? deliver & unload materials. 9) Famish only to be installed by others one(l) galvanized tube frame (4x4 tube) “ @ door @ section 3/D12. 10)F & I five (S) Antenna support frames on page S5. - orc? - 11)F & I steel @ roof of Radio Room—Page S4.

Any and all other work other than specifically included in this estimate is excluded from this proposal.

page2 of 2

«-» • o.-i

NYC-WTC_OO0172303

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172303Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Feinstein KS Inc. structural steel quote, May 1998 · Box 7DCAS

NYC-WTC_000172733

Formal quotation from Feinstein KS Inc. to the Mayor's Office of Emergency Management for structural steel and metal decking at the World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.938

machine-extracted · confidence unavailable · Check page ↗
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.898

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →