Same-box records
Bid proposal for structural steel framing work, May 1998 · Box 7DCASNYC-WTC_000173058
Proposal document outlining scope of work for structural steel framing and metal decking installation.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947
Scope of work bid for structural steel, May 1998 · Box 7DCASNYC-WTC_000172303
Bid document from KS Inc. detailing structural steel framing and metal decking work for the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.938
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCASNYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.906
Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.905
Change order #079 for blast door plates, 7 WTC, Apr · Box 7DCASNYC-WTC_000171670
Ambassador Construction submits Change Order #079 to install reinforcing plates for blast-proof doors at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.904
Consultant meeting minutes #11, Sep 1996 · Box 7DCASNYC-WTC_000166740
Minutes from the 11th consultant meeting at 7 World Trade Center dated September 29, 1996.
1 shared topics · Same agency, volume and box · similarity 0.904
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.903
Consultant meeting minutes for 7 World Trade Center, Oct 1998 · Box 7DCASNYC-WTC_000172255
Minutes from the fifteenth consultant meeting regarding the Mayor's Office of Emergency Management project at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.903
Revised construction proposal for Mayor's OEM floors, June 1998 · Box 7DCASNYC-WTC_000173147
A revised construction proposal from Ambassador Construction Co. Inc. for demolition and renovation work on the 1st, 7th, and 23rd floors of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.903
NYC-WTC_000171758 · Box 7DCAS1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.902
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.902
RFI log cover sheet, Sep 1998 · Box 7DCASNYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared topics · Same agency, volume and box · similarity 0.900