Plumbing and tank installation estimate, April 1998

Machine-extracted title · confidence 50%

Estimate from Ambassador Construction Company for furnishing and installing pumps, steel tanks, and hot water heaters at the Office of Emergency Management.

NYC-WTC_000172707

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172707
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

«4Z27/98 11:53 A F=’ 6? —'2 T — '5S r-lOM 12:51 p - © 1

6 • LQ iO North Prospect Avenue .ynbrooK New York 11563-1395 (16-887-4000 ■ax; Sie-593-9089

ESTIMATE NO: 33436-98 ESTIMATE DATE; 4/27/98 JOB NAME: OEM JO4 STREET: 7 WORLD TRADE CENTER JOB FLOOR: 1>7,23 JOB CITY; NEW YORK ESTIMATED BY; ML ARCHITECT: SWANKE HAYDEN ENGINEER; COSENTINI DATE OF PLANS; 4/06/98 PLAN REVISIONS: =: = = = = 3t5=«:=r = = 2= = = = = =: = = »==s = = = =:= = = s» = = = = = =» = = = = = = = = S'== = = = =

G<t NAME: AMBASSADOR CONSTRUCTION COMPANY AREA CODE: 212 PHONE: 922-1020 pilCB: $ 377,700.00 FAX NO; DATED QUOTED: 4/27/98 PERSON QUOTED: MARTIN SCHNEIDER N(J)TES;

SOOPE: FURNISH AND INSTALL PUMPS FURNISH AND INSTALL STEEL TANKS FURNISH AND INSTALL HOT WATER HEATERS-3 O't5 NEW FIXTURES AS SHOWN OVERTIME AT 22ND AND FOR RISERS EXCLUSIONS: SALES TAX.OVERTIME (EXCEPT AS NOTED ABOVE),RUBBISH REMOVAL, DUNNAGE FOR TANKS,DEMO,CONCRETE,ELECTRIC,installation OP HWAT,CUTTING,PATCHING,FIRESTOPPING,SHOWER DOORS,TOILET ACCESSORIES,ACCESS DOORS,LEAK DETECTOR SYSTEM,SUPPLY OF APPLIANCES,HOLE IN BUILDING WALL,flOIST CHARGES

NYC-WTC_000172707

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172707Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Plumbing estimate cover sheet, May 1998 · Box 7DCAS

NYC-WTC_000172706

Fax cover sheet from Ambassador Construction Company submitting an estimate for plumbing work at the Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947

machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCAS

NYC-WTC_000170825

Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.930

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →