Same-box records
Scope of work bid for structural steel, May 1998 · Box 7DCASNYC-WTC_000172303
Bid document from KS Inc. detailing structural steel framing and metal decking work for the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964
Feinstein KS Inc. structural steel quote, May 1998 · Box 7DCASNYC-WTC_000172733
Formal quotation from Feinstein KS Inc. to the Mayor's Office of Emergency Management for structural steel and metal decking at the World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.894
RFI log for 7 World Trade Center, revised July 22, · Box 7DCASNYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
Same agency, volume and box · similarity 0.892
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCASNYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.891
Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.891
Change order #004 systems installation, 7 WTC, Aug 1998 · Box 7DCASNYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
1 shared topics · Same agency, volume and box · similarity 0.891
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.890
P&S Industries quote for kitchen appliances, May 1998 · Box 7DCASNYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
Same agency, volume and box · similarity 0.888
NYC-WTC_000171758 · Box 7DCAS1 shared topics · Same agency, volume and box · similarity 0.887
Letter regarding Change Order #004, August 1998 · Box 7DCASNYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.887
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.887