NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.
NYC-WTC_000172686–000172689Folder label: “Mayor's OEM®7 World Trade Center®26th Floor (Revised)”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Sheetl ♦1 Electrical __ Temporary electrical lighting 45400sf .75/sf 35000 31033 ^eTTeratoJs 500KW/625KVA J 3 120000 360000 4000 2170 I rigging 80000 ? generators switchgear ___ 12500 12545 switchboard rigging 12000 ? Generator Work ? 60250 Relocate work in Meeh Room ? . 60000 SOOamps switchboard 277/480j/olt 3 5000 15000 lOOOamps switchboard 277/480 volt 3 7000 21000 leOOamps switchboard 277/480 volt 2 sooof 16000 3.5" EMT w/4-500 MCM switchgear to 23rd fl.' 2000LF 67/LF 135000,, ____991.000 375" EMT w74-500 MCM 300Lf 67/LF 20100 inc________ 3.5" EMT w/4-500 MCM UPS 89/LF line_____ 3"EM’T w/3-250 MCM L L 400 60/LF 24000 inc_______ 2:5"EMTw/4#3 7OOT5O/LF 35000 inc________ 2"RGCw74-#1 7 100^5^LF 3050 inc____ T5"I^Cw/4#2 7 100|WlF 3000 inc______ 1.25"RGCw/4#4 140125/LF 3500 inc I
Pull Boxes 71 750 550001 60000 Core Drill + Fireproofing & fap charges 200 _ 3203 60800 110000 ^pg — ‘ ‘ ■
By Motorola- installation cost only 7676 I- - ups input switchboard i? ups hot tie amp ? Ups output switchboard Amp. UPS Disconnect Switch !?- battery backup 2 10500] I 21000 ? Raised floor Grounding 20000 19318 Surge Protection 50000 ?
Connect Cooling Towers __ 2 1410J 2820 ? heat tracing _ lOOOOj IS Connect 2 EUH & 2 EHC, 6 fans, 6 water pumps 20 380! J000pncinJ4^q 4 fuel oil pumps, inc in 84400 Motors Starters and Disconnect „ „ 20 1400 280Winc in 84400 Connect 6 A/C Units 6 2400 84400 A/C Disconnect Switches _ 6' 580 3600 inc in 84400 Lighting Protection 50000
Electrical Lighting -23rd Fl 41760SF $8.5/SF 355000 543000 Electrical Lighting-7th Fl 3676SF ]W/SF 15000 included in 5 Mezannine Lighting 360SF $10SF 3600 included in 5 Fire Alarm 45860SF 115/SF 69000 included in 5 Power Panels 45800sf ! i $3.8/SF 175000 included in 5
Duplex oulets__ 125 Fuel oil Leak Detection System lOOOOi Power to leak detection __ ' 7 275 fuel oil bell ;? 12200 Transformers 112.5KVA/480Vprimary, f^/208V 1 i i 6300 6360 Page 1
NYC-WTC_000172688
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173881
Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.
Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168639
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172684
Revised electrical work proposal from Forest Electric Co. for the Mayor's Office of Emergency Management at 7 World Trade Center covering multiple floors.
1 shared non-person entities · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168645
Revised Change Order #16 submitted for electrical work at 7 World Trade Center dated October 19, 1998.
Same agency, volume and box · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171903
Ambassador Construction submits Change Order #018 for electrical work at the Mayor's Office of Emergency Management on October 15, 1998.
Same agency, volume and box · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168642
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
Same agency, volume and box · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173254
A letter detailing the installation of graphic annunciator panels and wiring for generators at the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105155
Invoice enclosing bulk sample results, air monitoring data, and cleanup summaries for 17 Battery Place.
1 shared non-person entities · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135975
Document containing illegible text or corrupted data within the Department of Environmental Protection's Athena D Terms records.
1 shared non-person entities · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Similar indexed content
Revised change order #16 submitted for electrical plan revisions regarding drawing changes at 7 World Trade Center.
Similar indexed content
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
Similar indexed content
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Similar indexed content
Revised electrical work proposal from Forest Electric Co. for the Mayor's Office of Emergency Management at 7 World Trade Center covering multiple floors.
Similar indexed content