Electrical proposal, ADCO Electrical Corp., May 1998
Machine-extracted title · confidence 95%
Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.
NYC-WTC_000172686–000172689
Folder label: “Mayor's OEM®7 World Trade Center®26th Floor (Revised)”
1. We exclude any overtime with exception to coring.
2. We exclude stand-by for other trades.
3. No patching, painting or cleanup,
4. Patching and installing exterior walls and roof penetrations by others.
! I
5. Price does not include transducers.
6. Antennae wiring by others. '
7. Price includes installation of emergency generator switchgear only, (KB.Q.).
8. AA^ wiring and c;oimections by others. 7
9. Space assumed to be free of any asbestos conditions and lead paint,
10. Labor rates effective thru June 11,1999.
AQCO electrical corporation •VA-
TOTAL P.02
NYC-WTC_000172687
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000172687Source: NYC Law Department, mirrored locally
Revised electrical work proposal from Forest Electric Co. for the Mayor's Office of Emergency Management at 7 World Trade Center covering multiple floors.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.917
Contractor proposal for electrical panels, risers, generators, fire alarm, wiring, and lighting work at 7 World Trade Center totaling approximately $3.76 million.
Revised electrical work proposal from Forest Electric Co. for the Mayor's Office of Emergency Management at 7 World Trade Center covering multiple floors.