CONSTRUCTION CO., INC.
Mayor’s Office of Emergency Management
7 World Trade Center
May 27. 1998
Page Two...
Breakdown Continue^,
— Furniture__ 300,500.00
; —Audio visual ' 1,793,907.00
/j Fabric Wall Panels _ _ 19,800.00
Projection Screen r 16,732.00
Folding Wall J 7.996.00
Metal Panel Wall
Special Doors — PETT^ 34,630.00
Metial Shelving 11,726.00
Safe Door —> C**— 4,130.00
Rolling Fire Door
Cut & Patch r 3,384.00
Generator Test CO) ioL 30,000.00
4,500.00
Wire Mesh Partition 3,250.00
General Conditions^SB^i 788,414.00
5- Overhead & Fee 6% 638,616.00
Insurance 1.25% e- 141,028.00
Total $11,423,238.00
Previously approved cost to pre-purchase generator and switch
gear \y $717,890.00
o U/VY CAv'.a.
(n)o^ .
Qualifications
- Demolition to be performed on week nights
- Use of EMT wiring and rigid conduit for all vertical runs and conduit over 2" diameter
- All furniture devices furnished by vendor
- Furnish and installation of security equipment is based upon Vikonics, Inc.’s drawings and
specifications
- All security wiring to be run in plenum, furnish and installation of conduits is limited to
Drawing TC-101 only
- Installation of cable tray and conduit required in Section 16700
- Furnish and installation of heat trace cable as per the electrical drawings only
- Termination of telephone and data wiring or cabling
- Contro£system for HVAC equipment not as specified, but as per meeting with Engineer
- Overtime except where required by building rules ----- ------------------
Forward.../
NYC-WTC_000172628