NYC 9/11 Public Portal Document
AMBASa>©eifi7:ONSTRUCTION co., INC.
May 27, 1998
Ms. Kathy Giliberti
Silverstein Properties, Inc.
120 Broadway
New York, NY 10271
RE; Mayor’s Office of Emergency Management
7 World Trade Center
1st, 7th & 23rd Floors
Dear Ms. Giliberti;
We are pleased to submit herewith our proposal for the work at the above referenced area in
accordance with Swanke Hayden Connell’s drawings and specifications (see attached lists)
for the sum of ELEVEN MILLION FOUR HUNDRED TWENTY THREE THOUSAND TWO
HUNDRED THIRTY EIGHT DOLLARS ($11,423,238.00):
Our breakdown is as follows:
Demolition $13,000.00
• Rubbish Removal 35,100.00
Drywall, Carpentry 390,000.00
Hollow Metal —r 13,120.00
Finish Hardware 30,109.00
Ceilings. . 289,400.00
Electric & Fixture^ 3,663,500.00
HVAC 1,329,000.00
Plumbing^. 389,675.00
Painting/Wallcovering 53,100.00
Floor, Base & Carpet 150,935.00
Iron & Steel 180,825.00
Cement & Concrete 100,765.00
Masonry/Plaster 29,000.00
Sprinklers 12^,400.00
Architectural Metal 178,250.00
Glass, Glazing & Mirrors 22,700.00
Ceramic Tile 29,600.00
Woodwork (^«»^ / 2 4/k^ rt—J 256,930.00
Purchase Items / 3 16,790.00
Raised Floors —* 92,300.00
Manhole Cover ( 2/ 1,515.00
Marble, Stone, Terrazzo 5,711.00
Venetian Blinds 19,200.00
Metal & Glass Partition 121,000.00
Fireproofing 7,000.00
Roofing & Waterproofing 49,700.00
i- <9/Forward.../
Ki-
317 MADISON AVENUE, NEW YORK, NY 1’0017, 212 922 1020, FAX 212 949 9762
NYC-WTC_000172627
OCR can misread numbers and units. Confirm readings against the page image before using them.