NYC 9/11 Public Portal Document
JUL 17 ’S7 @3:14PM SILVERSTETN PROP pg
07/17/97 THU 11:34 TEL 212 728 0398 MILO KLEINBERG as jo09
MOY=23+-1997 12:@1 P.
Rider “C" ;
Life Safety Sysiems |
e) Prior to eccupancy of the promises, and prior ca issuance of « Gerti{ | ate of Completion the
Tanant shall furnish to the WTC Supervising Enginesr, 2 copy of an | xecuted Agratmant between
| the Tenant and » Contractor who ahall ba responsible for inspection | nd msinm@asnes, a2 required
° hy the New York City Fire Prevendon Code of each new and/ar exis ing tenant life sefery system,
including but not limited to, smeke detection, pre-action ler » ‘ems end Halos suppression
systema, This Agreement may ne be cancdled, terminated, or medifi || without written advance
request to the Port Authority .
The Agreement. between the Tenanr and the Contractor shall id) that the Gontrector ix
approved by the city of New York to perform such maintenance and | aspectinn functions; thet the
Contractor will furnish copies of all periodic tests to the Post Autha: | y Coordinaur, Fire Safety
Programs; that the Conwactor will furnish copies of any rea ag :sments at least 15 days
pricr t» axpirution and will notify the Part Acthority Coordinator, Fs Gufety Program, ia the
event that the Agreemant hos been agneeled.
19. The Connractor shall mark the location af amales desemnts installed
on the undervide of the eailing tiles. The pina may be ebtained from C : wasions ar the B-2 Level. For
smnoles detectors located below the raisssl Boars, the Contractor shall t it locations with diztinctive
eolared pushypins on the ceiling directly above the detectors, or mount on tt | wall within the room, a
partial floor plan showing the raised floor trea with dimensioned locations t eath smoke detector
¢ ings wich enlored push-pins
20. It ia required that existing demising walls ba checked for penetrations ay. sealed fo remtere their fire
rating. In addirian, all existing structural steal firepronfing must b4 pate sd where material is
missing, as required by the WIC Supervising Engineer. The marerials ui | d for sealing penetrations
and patching firepoafing shall be as approwed by the Port Authority.
21, Ic shall be the reaponsibility of the Tenants consultant to eee to it chat the ‘Mowing requirement ix met:
All electrical werk ta be performed, including ull electrical devices fo wh ih, or from which, any
slestrical connection, or discannections are to be, made, shall be a) the Electrical Drawings.
22. The Contractor shall remove all electrical devices, including all conus ‘nd wizing specified on the
drawings, to be no longer in use.
23. Materials containing PVC will not be permitted in any permanent ¢enet | sien except for carpeting
and underlayment. |
24, The Tenant's Consultant shall submit for review and approved by the Pe |: Authority catalog cuts for
all new electrical panels and new circuit breakers whieb shall indicgte th |; they are U,L. listed. In
addition, whenever circuit breakers are te be installed in existing pancls, \¢ in panels nor made by the
esircuit breaker manufacturer, auch circuit breakers shall be U.L. if: ; for use in lead centers and
panel-boards manufactured by othen,
Special Requirements
B. The following [terns numbers 25 through 35 art net applicable t Communi: | tions Systema installations.
25. All permanent leck-ceww, keying, #te., must be of the “Corbin” system an | must sanfarm with Port
Authority requirements regarding stamping and keying of master ring cy . anders having the Port
Authority key-way. Is ia required that the Tenant purchase all their/cylio (2 from the Port Authority.
The Contractor must contact the World Trade Center Leckamith Sijop. EF : ur World Trade Center,
4th Floor, Telephone: 212-435-3182.
Page 4/7
(
06/23/97 FRI i1:. (TX/RE NO 9962]
NYC-WTC_000168209
OCR can misread numbers and units. Confirm readings against the page image before using them.