AMBASSADOR CONSTRUCTION CO., INC.
Mr. Walter Weems
August 26, 1998
Page 2
closed auxiliary contact in each switch as per Note #25, Drawing
#E3.O1.
E) Core drilling from 7th floor to 23rd floor. 107,900.00 — O —
4. Furnish and install auxiliary contacts in each circuit breaker
of switchboard EDPH-23 as per Drawing E3.01, Note #25
dated 7/24/98. Cost of wiring from each circuit breaker to the
Graphic annunciator is included under the graphic annunciator
above. Please see Item #1. 1,600.00 —
5. Change switchboard EDPH-23 from switch fuse to circuit
breakers panel due to the space problem, as discussed with
the engineer. 11,740.00 — O —
6. Change the interrupting capacity of Panel EDPH-23M from
GSKAto 100KA. 7,080.00 —O —
7. Furnish, install and wire additional fire alarm devises as per
revised Drawing E4-03 dated 7/24/98. 3,205.00
8. Provide and install additional circuit breakers to Panel 'EHP-1 ’
and ELP-23W as advised by the engineer.
■’ / ■ ' /.') V ' ' ■' "C' .
1,360.00 ,
9. Upgrade the size of ground conductor to 1 #2 in 1 1/4" conduit
as per Drawing #E3-01 dated 7/24/98. 3,690.00
Audio Vi«ual Work and. Equipment 4- tSS,O-7 5 -
Area; Pr®e$ Room
Delete:
Fiber distribution system, includes broadcast quality video
and balanced line level audio, with intercom. Miscellaneous
hardv/are, switches, relays panels, connectors, cabling,
lamps, terminal blocks, wall plates, etc., necessary to insure
a complete and operating system. (141,482.00)
FORCE QUOTE #080406MA
Forward...